9 Downtown
Complete project overview
RERA Karnataka · Registration filing- Project name
- 9 Downtown
- Towers
- 2
- Land area
- 672 sq m
- FAR sanctioned
- 1.29
- Covered area
- 336 sq m
- Open area
- 336 sq m
Timeline
Find your flat
Every flat the builder registered, with the carpet area they filed. Look yours up and check it against what you were shown.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes. Undivided share is the portion of the land that comes with the unit, as filed — a share of the whole plot, not a demarcated piece of ground.
| Unit | Type | Carpet | Undivided share | Unit | Type | Carpet | Undivided share |
|---|---|---|---|---|---|---|---|
| SHOP1Ground Floor · A | SHOP | 17 | 1 | 101Ground Floor · A | 1BHK | 31.13 | 1 |
| 102Ground Floor · A | RK | — | 1 | 2011st Floor · A | 3BHK | — | 1 |
| 2021st Floor · A | 2BHK | — | 1 | 3012nd Floor · A | 3BHK | — | 1 |
| 3022nd Floor · A | 2BHK | — | 1 | 1011st Floor · B | 2BHK | — | 1 |
| 1021st Floor · B | 2BHK | — | 1 | 1031st Floor · B | 2BHK | — | 1 |
| 1041st Floor · B | 2BHK | — | 1 | 2012nd Floor · B | 2BHK | — | 1 |
| 2022nd Floor · B | 2BHK | — | 1 | 2032nd Floor · B | 2BHK | — | 1 |
| 2042nd Floor · B | 2BHK | — | 1 | 3013rd Floor · B | 2BHK | — | 1 |
| 3023rd Floor · B | 2BHK | — | 1 | 3033rd Floor · B | 2BHK | — | 1 |
| 3043rd Floor · B | 2BHK | — | 1 | ||||
Builder’s track record
RERA Karnataka · Builder registrationSiddharth Realty
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Location & price analysis
RERA Karnataka · Registration filing- This project
- 3 nearby projects






- Taluk
- Chikkodi
- District
- Kolhapur
- Pincode
- 416001
- Address
- CTS no 297, Kumbhar Galli, Nipani
₹2.72 Cr declared. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imageryA building already stood within ~20 m of the recorded location in 2016 (about 7 m), 7 m in 2023.
Satellite view, year by year
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~20 m of the filed location.
Satellite photographs of the same ground
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
- A building is first visible in 2016.
- This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
- The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
- Site is a ~20 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
- Coordinate could not be cross-checked against nearby filings.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Government Guidance Rate
Karnataka registration departmentIn Karnataka it’s called the guidance value.
No government guidance rate is shown for this project.
Karnataka's guidance-value gazettes are in Horizon's record, but this project's address doesn't name a place any of its sub-registrar's tables print.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Planning authority
RERA Karnataka · Approved building planThe promised possession date (30 Jun 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Local Planning Authority
Town & Country PlanningHas approved 1,518 RERA projects — about 1 in 6 in Karnataka.
a mixed market — 42% apartments · 58% plotted layouts.
- Builders
- 1,212
- On record
- 42,750 flats · 54,584 plots
- Reach
- 128 taluks
- Since
- 2017
More layout-heavy than Karnataka overall — 58% plots here vs 38% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Complaints & litigation
RERA Karnataka · public recordNone on record with RERA Karnataka against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to RERA Karnataka- Litigation
- None declared in this filing
Only what the builder declared, or what RERA Karnataka records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Karnataka, or that this register doesn’t publish it — never that nothing happened.
Other projects nearby
The register · within 25 kmNo other residential and mixed-use projects still under way are on the record within 25 km.
Of the 3 projects the radar draws within 6 km — every kind, every stage — none is a residential and mixed-use project still under way. This list keeps only those, and looks further out.
What this record cannot tell you
- Build quality — no filing records how well it was actually built.
- Private disputes — only complaints escalated to the authority appear here.
- What it will be worth — the record is the past; it does not price the future.
Sources
Where each section of this report comes from.
- 01Complete project overview
- The project's registration filing with RERA Karnataka, as the builder submitted it.
- 02Builder's track record
- RERA Karnataka: the builder's registration.
- The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
- 03Location & price analysis
- Address, pincode and declared cost: the RERA Karnataka filing.
- Coordinates: as filed with RERA Karnataka.
- What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
- The Horizon Radar: the RERA-registered projects Horizon holds within 6 km of these coordinates.
- Map: © OpenStreetMap contributors (ODbL).
- 04Satellite view of the site
- Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
- Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
- 05Government Guidance Rate
- No government guidance rate could be matched to this project from Karnataka's published schedules.
- 06Planning authority
- RERA Karnataka: the approved building plan, as filed.
- The approving body's other projects: counted by Horizon across the register.
- 07Complaints & litigation
- RERA Karnataka's public record lists no complaints or litigation for this project.
- 08Other projects nearby
- The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/9-downtown-chikkodi-9k2tkleo.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.