Complete project overview

RERA Telangana · Registration filing
Units
118 units
Unit mix
118 × 2BHK
Saleable area
93–114 sq mper unit, as filed
Floors
6
Land area
3,554 sq m
Built-up area
9,916 sq m

Timeline

RERA approvedApr 2018
Proposed completionApr 2023
TodayJul 2026
Construction progress

9.5% overall, as filed

Podiums0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Basement & plinth15%
Excavation80%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

118 of 118 available
BuildingFloorTypeArea sq mAvailable
ABODE KNR RESIDENCY12BHK10711 of 11
ABODE KNR RESIDENCY12BHK992 of 2
ABODE KNR RESIDENCY12BHK1013 of 3
ABODE KNR RESIDENCY12BHK1094 of 4
ABODE KNR RESIDENCY12BHK10517 of 17
ABODE KNR RESIDENCY12BHK11011 of 11
ABODE KNR RESIDENCY12BHK11112 of 12
ABODE KNR RESIDENCY12BHK11013 of 13
ABODE KNR RESIDENCY12BHK10745 of 45

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

RERA Telangana · Promoter registration

ABODE DEVELOPERS

PartnershipPromoter type
Ranga Reddy, TelanganaBased in
5Projects
2Cities
2018–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
673 homeson the public record across 5 projects
99,794 sq mbuilt-up filed
35,545 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
Ameenpur
Village
AMEENAPUR
Mandal
AMEENPUR
District
Sangareddy
Pincode
502032
North boundary
Temple and Gram Kantam
East boundary
Land in Survey No 438 and 439
South boundary
Land in Survey No 442 part
West boundary
Road
What’s nearby
SchoolsNearest school 1.8km away
HealthcareHospital 1.9km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 2.4 kmPrimary road 4.0 kmRailway line 2.9 kmRailway station 3.3km away (Ramachandrapuram TS)Limited bus connectivity nearby
Water & environment
Water body 795 m
distances only — not a flood assessment
Government land classification

No residential (House Sites) class on record. The state classes this village’s land as Dry land, Wet Land double crop. If it’s sold as residential plots, verify the layout’s conversion / approval.

Telangana Registration & Stamps
Declared external development
Water supply50%
Roads0%
Sewerage (Chamber,…0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan

Hyderabad Metropolitan Development Authority (HMDA)

Urban Development Authority
Building Permit
Survey no. 440/1

The promised possession date (30 Apr 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

HMDA

Urban Development Authority · Hyderabad metropolitan periphery

Has approved 3,643 RERA projectsabout 1 in 3 in Telangana.

an apartments market72% apartments · 28% plotted layouts. Apartments like yours are this body's core business.

Builders
2,462
On record
3,98,695 flats · 1,96,015 plots
Reach
71 mandals
Since
2016

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.