HORIZONMarkets
01

Complete project overview

RERA Telangana · Registration filing
Units
20 units
Unit mix
20 × 2BHK
Saleable area
82–98 sq mper unit, as filed
Floors
5
Land area
942 sq m
Built-up area
1,985 sq m
Road widening
4 sq mland set aside for road widening

Timeline

RERA approvedApr 2022
Proposed completionApr 2025
TodayJul 2026
Construction progress

0% overall, as filed

Excavation0%
Basement & plinth0%
Podiums0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

20 of 20 available
BuildingFloorTypeArea sq mAvailable
AKSHARA RESIDENCY12BHK981 of 1
AKSHARA RESIDENCY12BHK851 of 1
AKSHARA RESIDENCY12BHK821 of 1
AKSHARA RESIDENCY12BHK871 of 1
AKSHARA RESIDENCY22BHK981 of 1
AKSHARA RESIDENCY22BHKmortgaged851 of 1
AKSHARA RESIDENCY22BHKmortgaged821 of 1
AKSHARA RESIDENCY22BHKmortgaged871 of 1
AKSHARA RESIDENCY32BHK981 of 1
AKSHARA RESIDENCY32BHK851 of 1
AKSHARA RESIDENCY32BHK821 of 1
AKSHARA RESIDENCY32BHK871 of 1
AKSHARA RESIDENCY42BHK981 of 1
AKSHARA RESIDENCY42BHK851 of 1
AKSHARA RESIDENCY42BHK821 of 1
AKSHARA RESIDENCY42BHK871 of 1
AKSHARA RESIDENCY52BHK981 of 1
AKSHARA RESIDENCY52BHK851 of 1
AKSHARA RESIDENCY52BHK821 of 1
AKSHARA RESIDENCY52BHK871 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

AKSHARA INFRA DEVELOPERS INDIA PRIVATE LIMITED

OthersPromoter type
Warangal Urban, TelanganaBased in
2Projects
2Cities
2022–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
20 homes · 89 plotson the public record across 2 projects
1,985 sq mbuilt-up filed
23,738 sq mplotted area
24,680 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
HUNTER ROAD HANAMKONDA
Village
GMH Hanmakonda
Mandal
Hanamkonda
District
Warangal Urban
Pincode
506002
North boundary
9M WIDE ROAD
East boundary
18M WIDE EXISTING AND PROPOSED ROAD
South boundary
OPEN LAND OF OTHERS
West boundary
OPEN LAND OF OTHERS
What’s nearby
SchoolsNearest school 1.9km away · College or university 1.6km away
HealthcareHospital 1.5km away · Clinic within 2km
LifestylePark 1.5km away · Swimming pool within 2km
ShoppingNo supermarket within 2km · Mall 1.9km away
Getting around
Expressway 1.8 kmPrimary road 1.9 kmRailway line 1.1 kmRailway station 3.4km away (Warangal)Limited bus connectivity nearby
Water & environment
River 945 mWater body 996 m
distances only — not a flood assessment
Declared external development
Roads0%
Water supply0%
Sewerage (Chamber,…0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan

Directorate of Town & Country Planning (DTCP)

Town & Country Planning (DTCP)
Building Permit no. 0124/BP/3006/2022Survey no. SY NO 976 OF HANAMKONDA(V)

The promised possession date (24 Apr 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan 0124/BP/3006/2022 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

DTCP

Town & Country Planning · towns & district HQs across Telangana

Has approved 3,737 RERA projectsabout 1 in 3 in Telangana, more than any other body in the state.

a plotted-layout market32% apartments · 68% plotted layouts. Apartments like yours are the smaller share here — this body mostly approves plotted layouts.

Builders
2,933
On record
41,686 flats · 4,33,404 plots
Reach
287 mandals
Since
2012

More layout-heavy than Telangana overall — 68% plots here vs 34% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.