5 × 3 BHK TYPE 2 (102 TO 502) · 5 × 3 BHK TYPE 6 (106 TO 506) · 5 × 3 BHK TYPE 1 (101 TO 501) · 5 × 3 BHK TYPE 4 (104 TO 504) · 5 × 3 BHK TYPE 3 (103 TO 503) · 5 × 3 BHK TYPE 5 (105 TO 505)
Carpet area
87–90 sq mper-type range, as filed
Land area
1,091 sq m
Timeline
Construction startJul 2023
RERA registeredFeb 2024
Proposed completionJan 2028
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
36 units across 12 batches
BuildingTypeArea sq mCount
ALORA3 BHK 606 with private terrace871
ALORA3 BHK TYPE 2 (102 TO 502)895
ALORA3 BHK TYPE 6 (106 TO 506)875
ALORA3 BHK TYPE 1 (101 TO 501)895
ALORA3 BHK TYPE 4 (104 TO 504)905
ALORA3 BHK 604 with private terrace901
ALORA3 BHK 605 with private terrace881
ALORA3 BHK 601 with private terrace891
ALORA3 BHK TYPE 3 (103 TO 503)875
ALORA3 BHK TYPE 5 (105 TO 505)885
ALORA3 BHK 603 with private terrace871
ALORA3 BHK 602 with private terrace891
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Bncmc1 of 2 projects
Collector Raigad AlibagCollector office1 of 2 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 694m away · 4 clinics within 1km
LifestyleNo parks within 2km · Swimming pool within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 237 mPrimary road 1.2 kmMetro station 1.3km away (Manasarovar)2 bus stops within 500m
Water & environment
Water body 1.9 km · Dravyavati River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹10.26 Cr declared to build 36 flats. What that works out to:
₹28.51 Lakhdeclared cost per flatall-in — land + construction
₹1,680/sq ftof built-up area₹18,078/sq m
12%of the cost is land₹1,075/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates (rural branch)
In Rajasthan it’s called the DLC rate.
₹418per sq yd
₹500per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “BHADARWAS”.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 20 Feb 2024 · 2 yrs ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
420 residential projects still under way within 25 km. Step out ring by ring: