HPRERASOL2022027/P · HP RERA · https://gethorizon.in/projects/ambika-hills-solan-q493og4x
01
Complete project overview
HP RERA · Registration filing
Inventory
66 units filed
Declared completion period
3 years 6 monthsduration from approval, as filed — no start date is on record
Registration valid until
27 Mar 2026
Description
Proposed Group Housing project comprising of 63 no. of 2bhk apartments situated near Gandhigram on the valley side of Nahan-Kumarhatti National Highway in Village Shamlech, Tehsil Solan, (H.P.)
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
66 units across 4 batches
TypeArea sq mCount
2 BHK7729
2 BHK7834
Covered Area of Ground Floor D Block = 52.30 sqm142
Covered Area of First Floor D Block = 52.30 sqm291
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 135 mPrimary road 1.0 kmRailway station 3.0km away (Barog)Limited bus connectivity nearby
Water & environment
River 2.0 km · Kaushalya
distances only — not a flood assessment
Land, title & encumbrance
Land parcelMohal/Mauza Shamlech · Tehsil Solan · Khasra 108
As declared by the builder at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Location — done
04
Government Guidance Rate
Himachal Pradesh registration department
In Himachal Pradesh it’s called the circle rate.
No government guidance rate is shown for this project.
Himachal Pradesh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
HP RERA · Approved building plan
Department of Town and Country Planning
Town & Country Planning (DTCP)
Building Permit no. 3624/SLN/DPASurvey no. 108
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 3624/SLN/DPA on the approving authority’s portal to confirm the approval.
Not published. HP RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to HP RERA
Litigation
None declared in this filing
Only what the builder declared, or what HP RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with HP RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
47 residential projects still under way within 25 km. Step out ring by ring:
Of the 39 projects the radar draws within 6 km — every kind, every stage — 22 are residential projects still under way. This list keeps only those, and looks further out.
2 projects within 1 km — showing the nearest 2.
580 m awayDevelopment / Construction (Residential)
NATURES HEAVEN
NATURE'S HEAVEN · Solan
Scale96 flatsRegistrationvalid to Jul 2026AuthorityHP RERA