HORIZON
Share

ANANDAM

P-DHR-20-2777 · RERA Madhya Pradesh · https://gethorizon.in/projects/anandam-dhar-u9jfycnk

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Plots
87 plots
Unit mix
79 × Residential Plot · 6 × Residential Ews Plot · 1 × Comeercial Plot · 1 × Residential Lig Plot
Revised completion
30 Dec 2021extended after an approved RERA extension
Extensions
1 approved · Covid19completion-date extension(s) granted by RERA

Timeline

Project startedJul 2019
RERA registeredOct 2020
Proposed completionSep 2021
TodaySep 2026

Find your plot

Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.

87 plots across 4 batches
TypeArea sq mCount
Residential Plot79
Comeercial Plot1
Residential Ews Plot6
Residential Lig Plot1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Madhya Pradesh · Builder registration

MANOJ VARMA

IndividualPromoter type
1Projects
1City
2020–2021Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Dhar
Tehsil
Dhar
Planning area
Dhar
Address
KH. NO 23/1/1 AND 23/1/2 AT VILLAGE DELMI ,TEH DHAR,M.P.
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 3.4km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 818 m · Indore-Mandu RoadPrimary road 3.1 km · Dhar BypassNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 2.7 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹4.86 Cr declared to build 87 plots. What that works out to:

₹5.59 Lakhdeclared cost per plotall-in — land + construction
49%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹7,525per sq yd
₹9,000per sq m
Which rate
open plot, residential
Matched to
The middle rate of the 30 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

DELAMI₹5,000 / sq m₹4,181 / sq yd1.2 km
SKY CITY (DELMI)(PLANNING)₹6,600 / sq m₹5,518 / sq yd1.5 km
DELAMI ME ANANDAM COLONY₹10,800 / sq m₹9,030 / sq yd1.6 km
SHRI MEERA RESIDENCY₹8,000 / sq m₹6,689 / sq yd1.6 km
DINDYALPURAM HOUSING BOARD COLONY ROAD SE ANDAR₹4,500 / sq m₹3,763 / sq yd1.9 km

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Dhar

Town & Country Planning (DTCP)
Layout Permit

The promised possession date (30 Sep 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Dhar

Town & Country Planning area · Dhar district

Has approved 24 RERA projects0.5% of Madhya Pradesh.

a plotted-layout market13% apartments · 87% plotted layouts. Your plotted layout is this body's core business.

Builders
22
On record
322 flats · 3,034 plots
Reach
5 tehsils
Since
2017

More layout-heavy than Madhya Pradesh overall — 87% plots here vs 72% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

16 plotted projects still under way within 25 km. Step out ring by ring:

2 projects within 3 km — showing the nearest 2.

DharPlotted Development

LAABHAM

SHREE LAXMINARAYAN DEVELOPERS (PROP. AMIT HIRWANI)

Sep 2024registered
Jun 2026target completion
Declared cost₹2.18 CrScale62 plotsAuthorityRERA Madhya Pradesh
DharPlotted Development

SKY CITY

TSD INFRAESTATE PRIVATE LIMITED

May 2026registered
Sep 2028target completion
Declared cost₹11.01 CrScale93 plotsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.