HORIZON
Share

BALAJI REGENCY

P-IND-17-068 · RERA Madhya Pradesh · https://gethorizon.in/projects/balaji-regency-juni-indore-v35mkk23

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
BALAJI REGENCY
Units
88 flats
Unit mix
88 × Residential
Quarterly reports
8 on file · latest Oct 2017 - Dec 2017quarterly progress certificates filed with RERA

Timeline

Project startedApr 2010
RERA registeredAug 2017
Proposed completionDec 2018
TodaySep 2026

Find your flat

Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.

88 units across 1 batch
TypeArea sq mCount
Residential88

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Madhya Pradesh · Builder registration

SHREE BALAJI INDIA INFRASTRUCTURE PRIVATE LIMITED

CompanyPromoter type
1Projects
1City
2017–2018Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Indore
Tehsil
Juni Indore
Planning area
Indore
Address
Gram Sirpur, Near Dravid Nagar, Dist. Indore (M.P. ) Khsra No. 515/1/2
What’s nearby
Schools7 schools within 1km · 8 educational institutions within 1km · College or university 545m away
HealthcareHospital 238m away · 38 clinics within 1km · Pharmacy within 500m
Lifestyle2 parks within 500m · Gym or sports centre 785m away · 5 restaurants and cafes within 1km
ShoppingSupermarket 232m away · Bank 695m away · ATM within 500m
Getting around
Expressway 1.0 kmPrimary road 1.0 km · Dhar RoadRailway line 1.6 kmRailway station 1.6km away (Lokmanya Nagar)Limited bus connectivity nearby
Water & environment
River 1.1 km · SaraswatiWater body 1.3 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹9.17 Cr declared to build 88 flats. What that works out to:

₹10.42 Lakhdeclared cost per flatall-in — land + construction
7%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹22,575per sq yd
₹27,000per sq m
Which rate
multi-storey residential
Matched to
The middle rate of the 294 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

DRAVID NAGAR GALI₹38,000 / sq m₹31,773 / sq yd50 m
DRAVID NAGAR/SWASTIK NAGAR/ USHA NAGAR MAIN AND EXTENSION - MAHU NAKE SE PHOOTI KOTHI TAK MAIN ROAD/SUKHNIWAS ROAD/PHOOTI KOTHI ROAD PAR₹60,000 / sq m₹50,168 / sq yd170 m
SIRPUR WARD 71₹25,000 / sq m₹20,903 / sq yd190 m
RANJIT HANUMAN MANDEER SE NAKODA RESTORANT CHOURAHA ROAD KE DONO TARAF₹55,000 / sq m₹45,987 / sq yd300 m
CHANDMARI/SAMAJVADI INDRA NAGAR₹26,000 / sq m₹21,739 / sq yd390 m

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Indore

Town & Country Planning (DTCP)
Building Permitapproved 31 Aug 2017 · 9 yrs ago

The promised possession date (31 Dec 2018) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Indore

Town & Country Planning area · Indore district

Has approved 1,123 RERA projectsabout 1 in 5 in Madhya Pradesh, more than any other body in the state.

a plotted-layout market34% apartments · 66% plotted layouts. Apartments like yours are the smaller share here — this body mostly approves plotted layouts.

Builders
776
On record
37,289 flats · 95,164 plots
Reach
10 tehsils
Since
2017

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

110 residential projects still under way within 25 km. Step out ring by ring:

33 projects between 1 and 3 km — showing the nearest 6.

IndoreApartment

BHAVYA SAMRADDHI

PRATIBHA SIYAL

Jan 2026registered
Sep 2028target completion
Declared cost₹12.31 CrScale6 flatsAuthorityRERA Madhya Pradesh
IndoreApartment

D ORNATE A1 BLOCK

NARENDRA GORANI

Jun 2025registered
Jan 2028target completion
Declared cost₹40.80 CrScale6 flatsAuthorityRERA Madhya Pradesh
IndoreApartment

SAGAR SAMRADDHI

SAGAR SHREE ENCLAVE

Jul 2024registered
Dec 2026target completion
Declared cost₹5.40 CrScale4 flatsAuthorityRERA Madhya Pradesh
IndoreApartment

JMD AURA

JMD HOUSING PROJECTS

Jun 2025registered
Apr 2027target completion
Declared cost₹4.74 CrScale8 flatsAuthorityRERA Madhya Pradesh
IndoreApartment

AVENTUS GRANDE

PRANAYAN DEVELOPERS LLP

Apr 2026registered
Oct 2027target completion
Declared cost₹10.79 CrScale10 flatsAuthorityRERA Madhya Pradesh
SanwerApartment

HIGHLINE HERITAGE

VB BUILDERS AND DEVELOPERS

Mar 2024registered
Sep 2026target completion
Declared cost₹165.05 CrScale410 flatsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.