Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. Carpet area is the legally meaningful number — not the super built-up figure a brochure quotes.
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 1km · College or university 869m away · Library 1.7km away
HealthcareHospital 651m away · Clinic within 2km
LifestylePark 1.9km away · Gym or sports centre 941m away
ShoppingSupermarket 1.1km away · Mall 921m away · Convenience store within 1km
Getting around
Expressway 4.1 kmPrimary road 353 m · Dharmapuri RoadRailway line 2.3 km · Howrah - Chennai Main LineRailway station 2.6km away (Vizianagaram Junction)Limited bus connectivity nearby
Water & environment
River 155 m · Pala Gedda NalaWater body 385 m
distances only — not a flood assessment
Government land classification
Land here includes House Sites (residential), plus Land abutting NH/SH/ZPP/MPP, Agricultural Land fit for H.S.. The state classes land per survey— confirm your plot’s survey number is House Sites.
AP Registration & Stamps
Declared external development
Roads0%
Water supply0%
Sewage0%
Electricity0%
Solid waste0%
Fire safety0%
Water0%
Emergency exits0%
Renewable energy0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisdeclared build cost — not a sale price
₹2.46 Cr declared to build 10 flats. What that works out to:
₹24.58 Lakhdeclared cost per flatall-in — land + construction
₹1,743/sq ftof built-up area₹18,764/sq m
18%of the cost is land₹1,179/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
AP Registration & Stamps
In Andhra Pradesh it’s called the market value — the registration department's figure, not a sale price.
₹15,000per sq yd
₹17,940per sq m
Which rate
House Sites
Matched to
The value published for this project's own survey number, in “survey 19, DHARMAPURI”.
In force
effective Feb 2025
What this number is — and isn’t
The minimum value Andhra Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Andhra Pradesh · Approved building plan
approved 27 Dec 2021 · 4 yrs ago
Building Permit no. 1093/0652/B/VZM/DAD/2021Survey no. 19
The promised possession date (27 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 1093/0652/B/VZM/DAD/2021 on the approving authority’s portal to confirm the approval.
The approving body, at scale
The local planning authority
The body that approved this project. It has approved 562 RERA projects across 8 mandals — about 1 in 12 in Andhra Pradesh.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
RERA Andhra Pradesh · public record
Complaints register
Not published. RERA Andhra Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Andhra Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Andhra Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Andhra Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
95 residential projects still under way within 25 km. Step out ring by ring: