The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RERA Andhra Pradesh · Registration filing
Village
NANNUR
Mandal
Orvakal
District
Kurnool
Pincode
518504
What’s nearby
SchoolsNo schools within 2km
HealthcareNo hospital within 5km · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 333 mPrimary road 810 mNo metro or railway within 5kmBus stop within 1km
Water & environment
Canal 3.2 km · HNSS Main Canal
distances only — not a flood assessment
Government land classification
Land here includes House Sites (residential), plus Land abutting NH/SH/ZPP/MPP, Agricultural Land fit for H.S.. The state classes land per survey— confirm your plot’s survey number is House Sites.
AP Registration & Stamps
Declared external development
Roads0%
Water supply0%
Sewage0%
Electricity0%
Solid waste0%
Fire safety0%
Water0%
Emergency exits0%
Renewable energy0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisdeclared build cost — not a sale price
₹2.28 Cr declared to build 142 plots. What that works out to:
₹1.60 Lakhdeclared cost per plotall-in — land + construction
₹113/sq ftof plotted area₹1,220/sq m
84%of the cost is land₹52/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
AP Registration & Stamps
In Andhra Pradesh it’s called the market value — the registration department's figure, not a sale price.
₹3,000per sq yd
₹3,588per sq m
Which rate
House Sites
Matched to
The rate published for the village of “NANNUR”.
In force
effective Feb 2025
Last revision
Up from ₹2,700 per sq yd
This filing declares ₹1,220 per sq m of plotted area — 0.34× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Andhra Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
The promised possession date (30 Aug 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 1106/0021/LP/KUDA/2023 on the approving authority’s portal to confirm the approval.
The approving body, at scale
Kurnool
Urban Development Authority
Has approved 113 RERA projects — 1.7% of Andhra Pradesh.
a mixed market — 58% apartments · 42% plotted layouts.
Builders
73
On record
2,305 flats · 5,785 plots
Reach
15 mandals
Since
2017
More layout-heavy than Andhra Pradesh overall — 42% plots here vs 26% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Andhra Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Andhra Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Andhra Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Andhra Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
7 plotted projects still under way within 25 km. Step out ring by ring:
Of the 4 projects the radar draws within 6 km — every kind, every stage — 1 is a plotted project still under way. This list keeps only those, and looks further out.