5 × 4 BHK FLAT NO. 101 TO 601 (GROUND FLOOR TO FIFTH FLOOR) · 5 × 4 BHK FLAT NO. 103 TO 603 (GROUND FLOOR TO FIFTH FLOOR) · 5 × 3 BHK FLAT NO. 104 TO 604 (GROUND FLOOR TO FIFTH FLOOR) · 5 × 3 BHK FLAT NO. 105 TO 605 (GROUND FLOOR TO FIFTH FLOOR) · 5 × 2 BHK FLAT NO. 102 TO 602 (GROUND FLOOR TO FIFTH FLOOR) · 5 × 3 BHK FLAT NO. 106 TO 606 (GROUND FLOOR TO FIFTH FLOOR)
Carpet area
81–114 sq mper-type range, as filed
Land area
888 sq m
Timeline
Construction startMay 2024
RERA registeredJun 2025
Proposed completionNov 2025
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
30 units across 6 batches
BuildingTypeArea sq mCount
BRAJESHWAR EMPIRE4 BHK FLAT NO. 101 TO 601 (GROUND FLOOR TO FIFTH FLOOR)1145
BRAJESHWAR EMPIRE4 BHK FLAT NO. 103 TO 603 (GROUND FLOOR TO FIFTH FLOOR)815
BRAJESHWAR EMPIRE3 BHK FLAT NO. 104 TO 604 (GROUND FLOOR TO FIFTH FLOOR)965
BRAJESHWAR EMPIRE3 BHK FLAT NO. 105 TO 605 (GROUND FLOOR TO FIFTH FLOOR)965
BRAJESHWAR EMPIRE2 BHK FLAT NO. 102 TO 602 (GROUND FLOOR TO FIFTH FLOOR)1105
BRAJESHWAR EMPIRE3 BHK FLAT NO. 106 TO 606 (GROUND FLOOR TO FIFTH FLOOR)965
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNearest school 1.2km away · College or university 1.1km away
HealthcareHospital 165m away · 3 clinics within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.9km away
ShoppingNo supermarket within 2km · Mall 1.8km away
Getting around
Expressway 717 mPrimary road 2.5 kmRailway line 935 mRailway station 2.1km away (Kanakpura)Bus stop within 500m
Water & environment
Water body 2.4 km · Fountain RD
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹8.27 Cr declared to build 30 flats. What that works out to:
₹27.55 Lakhdeclared cost per flatall-in — land + construction
₹2,012/sq ftof built-up area₹21,660/sq m
9%of the cost is land₹791/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹43,897per sq yd
₹52,500per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “C - Scheme”.
Highest rate
₹71,907 per sq yd — the top road-facing rate among the 48 residential rates published for this village
By the road it faces
interior plot
₹52,500 / sq m
₹43,897 / sq yd
road-facing
₹61,000 / sq m
₹51,004 / sq yd
41–60 ft road
₹67,100 / sq m
₹56,104 / sq yd
61–99 ft road
₹77,630 / sq m
₹64,909 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 11 Jun 2025 · 1 yr ago
The promised possession date (7 Nov 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
417 residential projects still under way within 25 km. Step out ring by ring: