Complete project overview

RERA Telangana · Registration filing
Units
20 units
Unit mix
15 × 2BHK, 5 × 3BHK
Saleable area
102–124 sq mper unit, as filed
Floors
5
Land area
798 sq m
Built-up area
1,854 sq m

Timeline

RERA approvedAug 2021
Proposed completionAug 2024
TodayJul 2026
Construction progress

46.1% overall, as filed

Podiums0%
External finishes0%
OC-readiness0%
Flat fit-out6%
Internal finishes15%
Stairs & lifts60%
Superstructure80%
Excavation100%
Basement & plinth100%
Stilt floor100%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

17 of 20 available
BuildingFloorTypeArea sq mAvailable
BRIGHT SPACE SHAGUN12BHKmortgaged1032 of 2
BRIGHT SPACE SHAGUN12BHKmortgaged1021 of 1
BRIGHT SPACE SHAGUN13BHK1240 of 1
BRIGHT SPACE SHAGUN22BHK1032 of 2
BRIGHT SPACE SHAGUN23BHK1241 of 1
BRIGHT SPACE SHAGUN22BHK1021 of 1
BRIGHT SPACE SHAGUN33BHK1241 of 1
BRIGHT SPACE SHAGUN32BHK1031 of 2
BRIGHT SPACE SHAGUN32BHK1020 of 1
BRIGHT SPACE SHAGUN42BHK1032 of 2
BRIGHT SPACE SHAGUN43BHK1241 of 1
BRIGHT SPACE SHAGUN42BHK1021 of 1
BRIGHT SPACE SHAGUN52BHK1032 of 2
BRIGHT SPACE SHAGUN53BHK1241 of 1
BRIGHT SPACE SHAGUN52BHK1021 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

BRIGHT SPACE CONSTRUCTIONS

PartnershipPromoter type
Ranga Reddy, TelanganaBased in
1Projects
1City
2021–2024Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
KONDAPUR VILLAGE
Mandal
Serilingampally
District
Ranga Reddy
Pincode
500084
North boundary
40 WIDE ROAD
East boundary
Plot No 80
South boundary
NEIGHBOURS LAND
West boundary
ROAD
What’s nearby
Schools1 school within 1km · College or university 2.0km away
HealthcareHospital 1.1km away · 1 clinic within 1km · Doctor's clinic within 1km
Lifestyle1 park within 500m · Gym or sports centre 1.1km away · 5 restaurants and cafes within 1km
ShoppingSupermarket 387m away · Mall 1.6km away · Bank 855m away
Getting around
Expressway 2.6 kmPrimary road 1.2 km · Gachibowli - Miyapur HighwayRailway line 1.5 kmRailway station 1.7km away (Hafeezpet)Limited bus connectivity nearby
Water & environment
Water body 819 m · Kudikunta Lake
distances only — not a flood assessment
Declared external development
Roads0%
Water supply0%
Sewerage (Chamber,…0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan

Greater Hyderabad Municipal Corporation (GHMC)

Municipal / Corporation
Building Permit no. 0061/GHMC/SLP/2021-BSurvey no. 218/8 (PART) & 218/9 (PART)

The promised possession date (2 Aug 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan 0061/GHMC/SLP/2021-B on the approving authority’s portal to confirm the sanction.

The approving body, at scale

GHMC

Municipal Corporation · Hyderabad city core

Has approved 3,102 RERA projectsabout 1 in 4 in Telangana.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
1,994
On record
2,20,211 flats · 3,387 plots
Reach
65 mandals
Since
2016

More apartment-heavy than Telangana overall — 99% apartments here vs 66% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.