The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
LifestylePark 815m away · 3 restaurants and cafes within 1km
ShoppingSupermarket 1.4km away · Mall 1.2km away
Getting around
Expressway 944 m · Grand Trunk RoadPrimary road 531 m · Kalna RoadRailway line 368 mRailway station 1.8km away (Barddhaman Junction)Limited bus connectivity nearby
Water & environment
Water body 112 mRiver 286 m · Banka River
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
West Bengal registration department
In West Bengal it’s called the market value — the registration directorate's figure, not a sale price.
No government guidance rate is shown for this project.
West Bengal's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
WBRERA · Approved building plan
Burdwan Municipality
Municipality
Building Permit
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Burdwan Municipality
Municipal corporation / municipality
Has approved 100 RERA projects — about 1 in 25 in West Bengal.
an apartments market — 100% apartments · 0% plotted layouts. Apartments like yours are this body's core business.
Builders
69
On record
2,633 flats · 0 plots
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. WBRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Flags on the record
WBRERA's list · builder's declaration
Defaulter list
This developer appears on WBRERA's defaulter listworth checking
The defaulter line is WBRERA's own list; a litigation line is the builder's declaration. Either is worth checking with WBRERA — neither is a verdict.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with WBRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
84 residential projects still under way within 25 km. Step out ring by ring:
Of the 105 projects the radar draws within 6 km — every kind, every stage — 78 are residential projects still under way. This list keeps only those, and looks further out.