270 × 2 BHK LIG · 126 × 1 BHK EWS · 81 × 2BHK LIG · 32 × LIG 2BHK
Carpet area
33–51 sq mper-type range, as filed
Land area
9,802 sq m
Completion deadline extended
2 extensions on record — latest to 9 Jan 2023declared reason: force majeure
Description
1. The phase area for phase was filled as 2951.85 sq. mtr. by mistake, the phase area should be read as total area 9801.51 sq.mtr. and the same has been marked on the drawings uploaded. Remaining amount has deposited in RERA Account by RTGS
2. The previously mentioned account details of the project account were :-
Name bank account account holder :- H L GROUP
A/C No. :- 50200028908220
IFSC Code :- HDFC0001054
Bank Name :- AXIS BANK
Branch :- HDFC BANK LTD TREETH STHAN, HOTEL VINOD STATION ROAD Beawar.
3. Based on the required of the promoters the account details has been changed on 27.09.2018
4. The Bank detail and projects details like that projects name, promoter profile,co promoter detail, Form g, Form B & land documents has been modified on 27/09/2018 based on the application of the promoter.As per remark the correct phase area has been rectified in Land Details of Registering Project.
Timeline
Construction startJan 2018
RERA registeredJan 2018
Proposed completionJan 2021
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
509 units across 6 batches
BuildingTypeArea sq mCount
HL GROUP ANMOL AASHIYANA2BHK LIG5181
HL GROUP ANMOL AASHIYANA2 BHK LIG51108
HL GROUP ANMOL AASHIYANA1 BHK EWS33126
HL GROUP ANMOL AASHIYANA2 BHK LIG5154
HL GROUP ANMOL AASHIYANALIG 2BHK5132
HL GROUP ANMOL AASHIYANA2 BHK LIG51108
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RAJ-RERA · Registration filing
Address
1097, VILLAGE FATEHPURIYA-II BEAWAR, Beawar, Ajmer, 305901
Taluka
Beawar
District
Ajmer
Pincode
305901
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 466m away · 2 clinics within 1km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 328 mPrimary road 1.0 kmRailway line 76 m · Western Dedicated Freight CorridorRailway station 403m away (Beawar)Limited bus connectivity nearby
Water & environment
Water body 773 mRiver 777 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹32.63 Cr declared to build 509 flats. What that works out to:
₹6.41 Lakhdeclared cost per flatall-in — land + construction
₹9,278/sq ftof built-up area₹99,871/sq m
15%of the cost is land₹450/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Nagar Parishad
Municipal Council
Building Permitapproved 24 Jan 2018 · 8 yrs ago
The promised possession date (9 Jan 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal body
A Nagar Nigam / Parishad / Palika that approves within its own town limits. It has approved 358 RERA projects across 29 districts — about 1 in 6 in Rajasthan.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within Ajmer
11 residential projects still under way within Ajmer. Step out ring by ring:
Of the 5 projects the radar draws within 6 km — every kind, every stage — 1 is a residential project still under way. This list keeps only those, and looks further out.