Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
10 units across 2 batches
TypeArea sq mCount
Villas1802
Villas2008
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SURVEY NO. 242/10,15,16,17,20,21,23,25 & 29, SITUATED AT , SIOLIM, VILLAGE BARDEZ, GOA , North Goa
District
North Goa
What’s nearby
Schools1 school within 1km
HealthcareNearest hospital 4.1km away · Clinic within 2km · Pharmacy within 500m
LifestyleNo parks within 2km · Gym or sports centre 1.0km away · 20+ restaurants and cafes within 1km
ShoppingSupermarket 90m away · Mall 1.5km away · Convenience store within 500m
Getting around
No metro or railway within 5km2 bus stops within 500m
Water & environment
Water body 648 m · temple pondCanal 939 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹9.68 Cr declared to build 10 flats. What that works out to:
₹96.81 Lakhdeclared cost per flatall-in — land + construction
₹5,083/sq ftof built-up area₹54,708/sq m
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Goa Revenue Department — land rates notified in the Official Gazette
In Goa it’s called the notified land rate.
₹15,050per sq yd
₹18,000per sq m
Which rate
land — rural area, base value (settlement zone S1, plot up to 1,000 m²)
Matched to
The rate published for the village of “Siolim”.
In force
2024-25 schedule
What this number is — and isn’t
The minimum value Goa’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Goa · Approved building plan
Building Permit
The promised possession date (31 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
Completion Certificate — the occupancy sign-off, on record
A Completion Certificateis on this project’s RERA record— the completion / legal-to-occupy sign-off that most RERA records simply don’t carry. It is issued by the planning authority, not by RERA. Still confirm it covers your specific unit before you rely on it.
Planning authority — done
06
Complaints & litigation
RERA Goa · public record
Complaints register
Not published. RERA Goa doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Goa
Litigation
None declared in this filing
Only what the builder declared, or what RERA Goa records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Goa, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
108 residential projects still under way within 25 km. Step out ring by ring: