HORIZON
Share

CONSTRUCTION OF 60 LIG, 139,LAND AT REWA EWS HOUSES WITH DEVELOPMENT OF 5.25 ACRES

P-RWA-17-489 · RERA Madhya Pradesh · https://gethorizon.in/projects/construction-of-60-lig-139-land-at-rewa-rewa-huzur-13a3r5sq

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
CONSTRUCTION OF 60 LIG, 139,LAND AT REWA EWS HOUSES WITH DEVELOPMENT OF 5.25 ACRES
Units
199 flats
Unit mix
139 × Ews · 60 × Lig
Revised completion
30 Jun 2021extended after an approved RERA extension
Extensions
2 approved · Normalcompletion-date extension(s) granted by RERA
Quarterly reports
16 on file · latest Oct 2017 - Dec 2017quarterly progress certificates filed with RERA

Timeline

Project startedOct 2015
RERA registeredOct 2019
Proposed completionDec 2019
TodaySep 2026

Find your unit

Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.

199 units across 2 batches
TypeArea sq mCount
Ews139
Lig60

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Madhya Pradesh · Builder registration

MPHIDB HO BHOPALTHROUGH EXECUTIVE ENGINEER MPHIDB DIVISION REWA

Government/Semi Government AgencyPromoter type
3Projects
1City
2018–2025Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
274 homeson the public record across 3 projects
₹33.36 Crdeclared build cost

Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.

Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

More from MPHIDB HO BHOPALTHROUGH EXECUTIVE ENGINEER MPHIDB DIVISION REWA— the full portfolio →

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
District
Rewa
Tehsil
Huzur
Planning area
Rewa
Address
ATAL PARISAR MAIDANI REWA
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.9km away · Clinic within 2km
LifestyleNo parks within 2km · Gym or sports centre 1.1km away
ShoppingNo supermarket within 2km · Mall 870m away
Getting around
Expressway 774 m · Rewa Bypass NH30Primary road 364 m · SH14Railway line 2.5 kmRailway station 2.8km away (Rewa)Limited bus connectivity nearby
Water & environment
Water body 615 mRiver 1.8 km · Bihar
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹16.46 Cr declared to build 199 flats. What that works out to:

₹8.27 Lakhdeclared cost per flatall-in — land + construction
9%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹17,141per sq yd
₹20,500per sq m
Which rate
RCC construction
Matched to
The rate published for “1- MAIDANI”, 200 m from this project.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

3- DHIRMA NALA SE BIDAWA OVER BRIJ TAK BANKUIYA ROD PAR DONO TARAF₹22,100 / sq m₹18,478 / sq yd380 m
6-DHIRMA NALA SE BAGHA BUILDER MOD TAK BIDA SEMARIYA ROD PAR (KARAHIYA, MADHI,ATARIYA,KITWARIYA SABHI GANW ME)₹22,200 / sq m₹18,562 / sq yd830 m
7- TURKAHA₹18,200 / sq m₹15,218 / sq yd870 m
4- KARAHIYA MANDI SE BANKUIYA ROD TAK NAYI ROD PAR₹19,000 / sq m₹15,886 / sq yd880 m
5- BANKUIYA ROD SE DUWARI SEMA TAK NAYI ROD PAR₹20,200 / sq m₹16,890 / sq yd1.2 km

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Rewa

Town & Country Planning (DTCP)
Building Permit

The promised possession date (31 Dec 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Rewa

Town & Country Planning area · Rewa district

Has approved 37 RERA projects0.7% of Madhya Pradesh.

an apartments market76% apartments · 24% plotted layouts. Apartments like yours are this body's core business.

Builders
17
On record
3,941 flats · 854 plots
Reach
2 tehsils
Since
2017

More apartment-heavy than Madhya Pradesh overall — 76% apartments here vs 28% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

3 residential projects still under way within 25 km. Step out ring by ring:

Of the 24 projects the radar draws within 6 km — every kind, every stage — 3 are residential projects still under way. This list keeps only those, and looks further out.

1 project within 1 km — showing the nearest 1.

540 m awayIndividual houses

ATAL PARISAR PHASE II MAIDANI DISTRICT REWA.

MPHIDB HO BHOPALTHROUGH EXECUTIVE ENGINEER MPHIDB DIVISION REWA · Rewa · Huzur

May 2022registered
Apr 2026target completion
possession revisedDeclared cost₹9.66 CrScale75 flatsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.