20 × Plot No31 To 50 · 14 × Plot No13 To 26 · 14 × Plot No85 To 98 · 14 × E1 To E14 Plot · 13 × Plot No70 To 82 · 10 × L1 To L10 Plot
Quarterly reports
10 on file · latest Apr 2023 - Jun 2023quarterly progress certificates filed with RERA
Timeline
Project startedJun 2023
RERA registeredSep 2023
Proposed completionJun 2026
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
179 plots across 47 batches
TypeArea sq mCount
Plot No1—1
Plot No 2 To 3—2
Plot No 4 To 7—4
Plot No8 To 10—3
Plot No11 To 12—2
Plot No13 To 26—14
Plot No27 To 28—2
Plot No29—1
Plot No30—1
Plot No31 To 50—20
Plot No51 To 59—9
Plot No60—1
Plot No61—1
Plot No62 To 68—7
Plot No69—1
Plot No70 To 82—13
Plot No83—1
Plot No84—1
Plot No85 To 98—14
Plot No99—1
Plot No100—1
Plot No101—1
Plot No102—1
Plot No103—1
Plot No104—1
Plot No105—1
Plot No106—1
Plot No107—1
Plot No108 To 115—8
Plot No116—1
Plot No117—1
Plot No118 To 125—8
Plot No126—1
Plot No127 To 133—7
Plot No134—1
Plot No135—1
Plot No136 To 142—7
Plot No143—1
Plot No144 To 147—4
Plot No148—1
Plot No149—1
Plot No150—1
Plot No151 To 152—2
Plot No153—1
Plot No154 To 155—2
E1 To E14 Plot—14
L1 To L10 Plot—10
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RERA Madhya Pradesh · Registration filing
District
Dewas
Tehsil
Dewas
Planning area
Other
Address
Khasra number 103/4/1, 103/5/1, 103/6/1 at Village Jetpura Tehsil Dewas distt. Indore
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 334m away · 2 clinics within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 127m away · Bank 199m away
Getting around
Expressway 3.0 km · Dewas BypassPrimary road 3 mRailway line 808 mRailway station 1.2km away (Dewas Junction)Limited bus connectivity nearby
Water & environment
Water body 1.6 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹5.38 Cr declared to build 179 plots. What that works out to:
₹3.00 Lakhdeclared cost per plotall-in — land + construction
42%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
MP Department of Registration & Stamps
In Madhya Pradesh it’s called the collector guideline rate.
₹8,361per sq yd
₹10,000per sq m
Which rate
open plot, residential
Matched to
The middle rate of the 539 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026
Colonies around this project
KUNAL HOTEL SE KHANUJA PETROL PUMP TAK A.B.ROAD PAR (DEWAS JUNIOR)
₹54,400 / sq m
₹45,485 / sq yd
60 m
EIDGAH ROAD PAR (DEWAS JUNIOR)
₹29,600 / sq m
₹24,749 / sq yd
80 m
BHOPAL CHOURAHE SE HOTEL SWASHTIK GARDEN TAK BHOPAL ROAD PAR (DEWAS SENIOR)
₹23,200 / sq m
₹19,398 / sq yd
80 m
SARDAR PATEL MARG PAR (DEWAS JUNIOR)
₹23,200 / sq m
₹19,398 / sq yd
180 m
SUTAR BAKHAL (DEWAS JUNIOR)
₹12,000 / sq m
₹10,034 / sq yd
180 m
The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.
What this number is — and isn’t
The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Madhya Pradesh · Approved building plan
Layout Permitapproved 22 Sep 2023 · 3 yrs ago
The promised possession date (4 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RERA Madhya Pradesh · public record
Complaints register
Not published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Madhya Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
196 plotted projects still under way within 25 km. Step out ring by ring: