HORIZONMarkets
01

Complete project overview

RERA Telangana · Registration filing
Units
10 units
Unit mix
1 × 3 Bed Room 101, 1 × 3 Bed Room 102, 1 × 3 Bed Room 201, 1 × 3 Bed Room 202, 1 × 3 Bed Room 301, 1 × 3 Bed Room 302, 1 × 3 Bed Room 401, 1 × 3 Bed Room 402, 1 × 3 Bed Room 501, 1 × 3 Bed Room 502
Saleable area
156–160 sq mper unit, as filed
Floors
5
Land area
557 sq m
Built-up area
1,680 sq m

Timeline

RERA approvedNov 2021
Proposed completionNov 2027
TodayJul 2026
Construction progress

0% overall, as filed

Excavation0%
Basement & plinth0%
Podiums0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

10 of 10 available
BuildingFloorTypeArea sq mAvailable
ELITE MANSION13 Bed Room 1011601 of 1
ELITE MANSION13 Bed Room 1021561 of 1
ELITE MANSION23 Bed Room 2011601 of 1
ELITE MANSION23 Bed Room 2021561 of 1
ELITE MANSION33 Bed Room 301mortgaged1601 of 1
ELITE MANSION33 Bed Room 302mortgaged1561 of 1
ELITE MANSION43 Bed Room 4011601 of 1
ELITE MANSION43 Bed Room 4021561 of 1
ELITE MANSION53 Bed Room 5011601 of 1
ELITE MANSION53 Bed Room 5021561 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

SHRUSHTI DUROBUILD (OPC) PRIVATE LIMITED

CompanyPromoter type
Warangal Urban, TelanganaBased in
1Projects
1City
2021–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
HUNTER ROAD
Village
GMH Hanmakonda
Mandal
Hanamkonda
District
Warangal Urban
Pincode
506002
North boundary
PLOT NO 5 PART
East boundary
PLOT Nos 9 10 AND 11
South boundary
33 FEET WIDE ROAD
West boundary
33 FEET WIDE ROAD
What’s nearby
SchoolsNearest school 1.3km away · College or university 1.5km away
HealthcareHospital 1.2km away · Clinic within 2km
LifestylePark 1.5km away · Gym or sports centre 2.0km away · Swimming pool within 2km
ShoppingSupermarket 1.3km away · Mall 1.7km away
Getting around
Expressway 1.6 kmPrimary road 1.1 kmRailway line 2.1 kmRailway station 4.7km away (Warangal)Limited bus connectivity nearby
Water & environment
Water body 475 m
distances only — not a flood assessment
Declared external development
Roads0%
Water supply0%
Sewerage (Chamber,…0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan

Directorate of Town & Country Planning (DTCP)

Town & Country Planning (DTCP)
Building Permit
Survey no. 981
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

DTCP

Town & Country Planning · towns & district HQs across Telangana

Has approved 3,737 RERA projectsabout 1 in 3 in Telangana, more than any other body in the state.

a plotted-layout market32% apartments · 68% plotted layouts. Apartments like yours are the smaller share here — this body mostly approves plotted layouts.

Builders
2,933
On record
41,686 flats · 4,33,404 plots
Reach
287 mandals
Since
2012

More layout-heavy than Telangana overall — 68% plots here vs 34% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.