GAJANAN RESIDENTIAL CUM COMMERCIAL TOWER
Complete project overview
RERA Madhya Pradesh · Registration filing- Units
- 16 flats
- Quarterly reports
- 6 on file · latest Oct 2024 - Dec 2024quarterly progress certificates filed with RERA
Timeline
Builder’s track record
RERA Madhya Pradesh · Builder registrationGAJANAN BUILDERS AND ASSOCIATES
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Location & price analysis
RERA Madhya Pradesh · Registration filing- District
- Betul
- Tehsil
- Betul
- Planning area
- Betul
- Address
- village badora thesil betul district betul
₹12.09 Cr declared to build 16 flats. What that works out to:
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Government Guidance Rate
MP Department of Registration & StampsIn Madhya Pradesh it’s called the collector guideline rate.
- Which rate
- multi-storey residential
- Matched to
- The middle rate across 164 colonies of “Betul”.
- In force
- 2026-2027 schedule · effective Apr 2026
What this number is — and isn’t
- The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
- Not a market price. Sales normally register above it, and how far above varies by place and by project.
- Its fit depends on the grain the state publishes at. This one is matched at the level of local body, and says so above. How Horizon decides what to show.
Planning authority
RERA Madhya Pradesh · Approved building planThe promised possession date (5 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Betul
Town & Country Planning area · Betul districtHas approved 37 RERA projects — 0.7% of Madhya Pradesh.
a mixed market — 38% apartments · 62% plotted layouts.
- Builders
- 33
- On record
- 471 flats · 2,068 plots
- Reach
- 3 tehsils
- Since
- 2017
More apartment-heavy than Madhya Pradesh overall — 38% apartments here vs 28% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Complaints & litigation
RERA Madhya Pradesh · public recordNot published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Madhya Pradesh- Litigation
- None declared in this filing
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
What this record cannot tell you
- Build quality — no filing records how well it was actually built.
- Private disputes — only complaints escalated to the authority appear here.
- What it will be worth — the record is the past; it does not price the future.
- Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.