The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location
WBRERA · Registration filing
District
North 24-Parganas
Municipality / area
Halisahar
Police station
Bijpur
Address
BOLDEGHATA DR N C BOSE ROAD
Pincode
743134
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 3.9km away · Pharmacy within 500m
LifestylePark 891m away
ShoppingNo supermarket within 2km · Mall 548m away
Getting around
Expressway 2.5 km · Kalyani-Barrackpur expresswayPrimary road 377 mRailway line 2.1 kmRailway station 2.5km away (Kanchrapara Workshop Gate)Bus stop within 500m
Water & environment
Water body 59 mRiver 2.6 km · Hooghly
distances only — not a flood assessment
Location — done
04
Government Guidance Rate
West Bengal registration department
In West Bengal it’s called the market value — the registration directorate's figure, not a sale price.
No government guidance rate is shown for this project.
West Bengal's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
WBRERA · Approved building plan
Halisahar Municipality
Municipality
Building Permit
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Municipal Corporation / Municipality
A city corporation or municipality that approves building permits within its own limits — West Bengal's OBPAS approving body. It has approved 2,282 RERA projects across 21 districts — about 1 in 1 in West Bengal.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
06
Complaints & litigation
WBRERA · public record
Complaints register
Not published. WBRERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
Flags on the record
WBRERA's list · builder's declaration
Defaulter list
This developer appears on WBRERA's defaulter listworth checking
The defaulter line is WBRERA's own list; a litigation line is the builder's declaration. Either is worth checking with WBRERA — neither is a verdict.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with WBRERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
112 residential projects still under way within 25 km. Step out ring by ring: