Complete project overview

RERA Telangana · Registration filing
Units
10 units
Unit mix
10 × 3BHK
Saleable area
144 sq mper unit, as filed
Floors
5
Land area
576 sq m
Built-up area
1,315 sq m

Timeline

RERA approvedMar 2018
Proposed completionOct 2022
TodayJul 2026
Construction progress

80% overall, as filed

Basement & plinth0%
Podiums0%
Excavation100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

0 of 10 available
BuildingFloorTypeArea sq mAvailable
HILL SIDE APPARTMENT13BHK1440 of 2
HILL SIDE APPARTMENT23BHK1440 of 2
HILL SIDE APPARTMENT33BHK1440 of 2
HILL SIDE APPARTMENT43BHK1440 of 2
HILL SIDE APPARTMENT53BHK1440 of 2

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system.

02

Builder’s track record

RERA Telangana · Promoter registration

MOHAMMED MUZAMMIL SHAREEF

IndividualPromoter type
Ranga Reddy, TelanganaBased in
1Projects
1City
2018–2022Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Telangana · Registration filing
Locality
DOLLAR HILLS
Village
Puppalguda
Mandal
Gandipet
District
Ranga Reddy
Pincode
500089
North boundary
30 WIDE ROAD
East boundary
PLOT NO 7 PART
South boundary
PLOT NO 10 11
West boundary
PLOT NO 6 PART
What’s nearby
SchoolsNearest school 1.2km away · College or university 1.8km away
HealthcareHospital 523m away · 2 clinics within 1km · Pharmacy within 500m
LifestylePark 1.7km away · Gym or sports centre 589m away · 3 restaurants and cafes within 1km
ShoppingSupermarket 459m away · Mall 1.9km away · Bank 491m away
Getting around
Expressway 3.3 kmPrimary road 1.9 km · Old Bombay HighwayMetro station 4.4km away (Peddamma Gudi)Limited bus connectivity nearby
Water & environment
Water body 1.3 km · Golconda Mote
distances only — not a flood assessment
Government land classification

No residential (House Sites) class on record. The state classes this village’s land as Dry land, Land abutting NH/SH/ZPP/MPP. If it’s sold as residential plots, verify the layout’s conversion / approval.

Telangana Registration & Stamps
Declared external development
Water supply100%
Sewerage (Chamber,…100%
Rainwater100%
Electricity100%
Landscaping and Tr…100%
Roads0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Renewable energy0%
Fire safety0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisno declared cost on this filing — one government benchmark below

This state’s RERA filing carries no declared build cost at all — nothing to turn into a per-unit or per-sq-ft figure here. The one real, government-sourced number below is the closest thing to a benchmark this record can offer.

Government guidance value
₹36,800/sq ydresidential

₹44,012/sq m · effective May 2026 · apartments ₹2,700/sq ft, same source

The state’s minimum value for this locality’s land, set for stamp duty — a floor, not a market price. Source: Telangana Registration & Stamps.

04

Planning authority

RERA Telangana · Approved building plan

Hyderabad Metropolitan Development Authority (HMDA)

Urban Development Authority
Building Permit no. 005714/SKP/R1/U6/HMSurvey no. 106,106/1,113,113/1

The promised possession date (31 Oct 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan 005714/SKP/R1/U6/HM on the approving authority’s portal to confirm the sanction.

The approving body, at scale

HMDA

Urban Development Authority · Hyderabad metropolitan periphery

Has approved 3,643 RERA projectsabout 1 in 3 in Telangana.

an apartments market72% apartments · 28% plotted layouts. Apartments like yours are this body's core business.

Builders
2,462
On record
3,98,695 flats · 1,96,015 plots
Reach
71 mandals
Since
2016

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.