26 × C Plot · 16 × F Plot · 14 × I Plot · 4 × Al Plot · 2 × K Plot · 1 × A Plot
Quarterly reports
19 on file · latest Oct 2017 - Dec 2017quarterly progress certificates filed with RERA
Timeline
Project startedApr 2016
RERA registeredDec 2017
Proposed completionMar 2019
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
100 plots across 43 batches
TypeArea sq mCount
A Plot—1
B Plot—1
C Plot—26
D Plot—1
E Plot—1
F Plot—16
G Plot—1
H Plot—1
I Plot—14
J Plot—1
K Plot—2
L Plot—1
M Plot—1
N Plot—1
O Plot—1
P Plot—1
Q Plot—1
R Plot—1
S Plot—1
T Plot—1
W Plot—1
X Plot—1
Y Plot—1
Z Plot—1
Aa Plot—1
Ab Plot—1
Ac Plot—1
Ad Plot—1
Ae Plot—1
Af Plot—1
Ag Plot—1
Ah Plot—1
Ai Plot—1
Aj Plot—1
Ak Plot—1
Al Plot—4
Am Plot—1
An Plot—1
Ao Plot—1
Ap Plot—1
Aq Plot—1
Ar Plot—1
As Plot—1
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RERA Madhya Pradesh · Registration filing
District
Sagar
Tehsil
Sagar
Planning area
Sagar
Address
Near Gopal Mandir, Subedar Ward, Sagar - 470002 MP
What’s nearby
SchoolsNearest school 1.3km away · College or university 1.2km away
HealthcareHospital 7m away · Clinic within 2km
LifestylePark 773m away
ShoppingSupermarket 978m away
Getting around
Expressway 1.8 kmPrimary road 861 m · Jyotesh Pandey Sagar RoadRailway line 2.0 km · Bina - Katni railwayRailway station 2.3km away (Saugor Railway Station P...... 2)Limited bus connectivity nearby
Water & environment
Water body 818 mRiver 4.6 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹4.56 Cr declared to build 100 plots. What that works out to:
₹4.56 Lakhdeclared cost per plotall-in — land + construction
31%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
MP Department of Registration & Stamps
In Madhya Pradesh it’s called the collector guideline rate.
₹16,723per sq yd
₹20,000per sq m
Which rate
open plot, residential
Matched to
The middle rate of the 205 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026
Colonies around this project
GOKULDHAAM COLONY
₹15,000 / sq m
₹12,542 / sq yd
110 m
SHESH WARD
₹7,000 / sq m
₹5,853 / sq yd
330 m
GOLA KUAA TIGADDA SE GOPAL MANDIR MARG
₹18,000 / sq m
₹15,050 / sq yd
340 m
SHRI GOPAL VIHAR COLONY
₹14,000 / sq m
₹11,706 / sq yd
350 m
MUKHYA MARG
₹12,000 / sq m
₹10,034 / sq yd
370 m
The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.
What this number is — and isn’t
The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Madhya Pradesh · Approved building plan
Sagar
Town & Country Planning (DTCP)
Layout Permitapproved 30 Dec 2017 · 8 yrs ago
The promised possession date (31 Mar 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Sagar
Town & Country Planning area · Sagar district
Has approved 50 RERA projects — 0.9% of Madhya Pradesh.
a plotted-layout market — 12% apartments · 88% plotted layouts. Your plotted layout is this body's core business.
Builders
33
On record
728 flats · 3,896 plots
Reach
2 tehsils
Since
2017
More layout-heavy than Madhya Pradesh overall — 88% plots here vs 72% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Madhya Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
21 plotted projects still under way within 25 km. Step out ring by ring:
16 projects between 1 and 3 km — showing the nearest 6.