• As per Township Policy, Residential Plot No. 22, 40, 41, 42, 43, 44, 45 total admeasuring 1530.22 sq. yards have been kept mortgage with Jodhpur Development Authority, Jodhpur. These plots would be allotted after the internal development work is completed and development charges are deposited with Jodhpur Development Authority, Jodhpur.
• Open Area of the project is 6950.59 sq. meters which includes Park [855.91 sq. meters], SWM & MT [75.74 sq. meters], Road [6018.94 sq. meters].
• Total Saleable Area of the Project is 10127.16 sq. meters which includes – Residential [10127.16 sq. meters].
Timeline
Construction startFeb 2024
RERA registeredSep 2024
Proposed completionAug 2025
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
53 plots across 12 batches
TypeArea sq mCount
Plot1871
Plot22311
Plot4221
Plot4641
Plot1341
Plot16728
Plot1341
Plot1782
Plot2091
Plot1674
Plot2231
Plot2491
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 2.1 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 2.7 km · Jojari
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹2.63 Cr declared to build 53 plots. What that works out to:
₹4.97 Lakhdeclared cost per plotall-in — land + construction
₹143/sq ftof plotted area₹1,541/sq m
46%of the cost is land₹65/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Layout Permitapproved 23 Sep 2024 · 2 yrs ago
The promised possession date (15 Aug 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
122 plotted projects still under way within 25 km. The nearest 6: