HORIZONMarkets
01

Complete project overview

RAJ-RERA · Registration filing
Units
330 units
Mix
90 × EWS BLOCK 7 · 40 × LIG BLOCK 5 · 40 × LIG BLOCK 6 · 40 × LIG BLOCK 2 · 40 × LIG BLOCK 3 · 40 × LIG BLCOK 4
Carpet area
15–46 sq mper-type range, as filed
Land area
10,886 sq m
Completion deadline extended
3 extensions on record — latest to 31 Dec 2026declared reason: force majeure
Description
1. The Total area of project is 10886.22 Sq. Mtrs but in the building plan approved by UIT, Abu they have approved 8949.22 Sq. Mtrs area planning and remaining planning they have not approved yet therefore they have marked as Future Expansion for which seperate RERA Registration will be done in future if approved and for that building plan having demarcation of approved area and future expansion area is attached at Architectural Drawing in Building Tab. 2. The Finish date committed for the project as per Form"B" is 31/12/2022 which is beyond the validity period of the approved maps.The promoter takes the responsibility to obtain the necessary extention from the competent authority. 3..Initally we have mentioned the phase as 8949.22 Sq m. however due to technical error it is showing as 0 therefore it should be read as 8949.22 Sq.m. 4.As per the approved checklist issued by UIT,Abu dated 19/07/2019 wherein at point no.-2 they have mentioned CMJAY proposed area 10886.22 sq.m however the sanctioned drawing of same issued by UIT,Abu for 8949.22 Sq.m leaving remaining area for future extention for same area endrosment has also been done by COA Registered Architecture. 5. No other professionals are appointed apart from architect and contractor and if other professionals will be appointed then such will be intimated to RERA.

Timeline

RERA registeredAug 2019
Construction startOct 2019
Proposed completionDec 2022
TodayJul 2026

Find your unit

Filed by type and size, in the batches the promoter registered — not a per-unit listing. Look yours up.

330 units across 13 batches
BuildingTypeArea sq mCount
HIGH SKY HOMESSHOP 4211
HIGH SKY HOMESLIG BLOCK 54640
HIGH SKY HOMESLIG BLOCK 64640
HIGH SKY HOMESEWS BLOCK 72990
HIGH SKY HOMESLIG BLOCK 14634
HIGH SKY HOMESLIG BLOCK 24640
HIGH SKY HOMESSHOP 1211
HIGH SKY HOMESSHOP 2171
HIGH SKY HOMESSHOP 3151
HIGH SKY HOMESSHOP 5171
HIGH SKY HOMESSHOP 6151
HIGH SKY HOMESLIG BLOCK 34640
HIGH SKY HOMESLIG BLCOK 44640

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RAJ-RERA · Promoter registration

HIGH SKY HOMES

OrganisationPromoter type
Sirohi, RajasthanBased in
1Projects
1City
2019–2022Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RAJ-RERA · Registration filing
Address
982,985,986, Amthala, Amthala, Abu Road, Sirohi, 307510
Village
Amthala
Taluka
Abu Road
District
Sirohi
Pincode
307510
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.5km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 1.5 km · Abu Road BypassRailway line 1.8 kmRailway station 1.8km away (Kivarli)Limited bus connectivity nearby
Water & environment
River 1.2 km · Sukli NadiWater body 2.0 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹28.75 Cr declared to build 330 flats. What that works out to:

₹8.71 Lakhdeclared cost per flatall-in — land + construction
₹1,348/sq ftof built-up area₹14,506/sq m
3%of the cost is land₹64/sq ft of land

This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Planning authority

RAJ-RERA · Approved building plan
Building Permitapproved 16 Aug 2019 · 6 yrs ago

The promised possession date (31 Dec 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RAJ-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RAJ-RERA does not publish a complaints register. This read cannot speak to them either way.