The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RERA Andhra Pradesh · Registration filing
Village
KATHEVARAM
Mandal
Tenali
District
Guntur
Pincode
522201
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.7km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 1.5 km · Tenali - Mangalagiri RoadRailway line 2.1 kmRailway station 4.0km away (Chinnaravuru)Limited bus connectivity nearby
Water & environment
Water body 640 mCanal 1.5 km
distances only — not a flood assessment
Government land classification
Land here includes House Sites (residential), plus Agricultural Land fit for H.S., Dry land, Land abutting NH/SH/ZPP/MPP. The state classes land per survey— confirm your plot’s survey number is House Sites.
AP Registration & Stamps
Declared external development
Roads0%
Water supply0%
Sewage0%
Electricity0%
Solid waste0%
Fire safety0%
Water0%
Emergency exits0%
Renewable energy0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisdeclared build cost — not a sale price
₹8.37 Cr declared to build 47 plots. What that works out to:
₹17.80 Lakhdeclared cost per plotall-in — land + construction
₹1,276/sq ftof plotted area₹13,730/sq m
82%of the cost is land₹559/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Andhra Pradesh registration department
In Andhra Pradesh it’s called the market value — the registration department's figure, not a sale price.
No government guidance rate is shown for this project.
Andhra Pradesh's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (14 Feb 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 15/2023/1168/APCRDA/DPMS on the approving authority’s portal to confirm the approval.
The approving body, at scale
Guntur
Municipal Corporation
Has approved 600 RERA projects — about 1 in 11 in Andhra Pradesh.
an apartments market — 81% apartments · 19% plotted layouts. Layouts like yours are the smaller share here — this body mostly approves apartments.
Builders
392
On record
15,171 flats · 12,166 plots
Reach
31 mandals
Since
2014
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Andhra Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Andhra Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Andhra Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Andhra Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
97 plotted projects still under way within 25 km. Step out ring by ring:
Of the 30 projects the radar draws within 6 km — every kind, every stage — 11 are plotted projects still under way. This list keeps only those, and looks further out.
3 projects between 1 and 3 km — showing the nearest 3.