Complete project overview

RERA Telangana · Registration filing
Units
13 units
Unit mix
1 × Ground Floor, 1 × Ninth Floor, 1 × Tenth Floor, 1 × Eleventh Floor, 1 × Tweleth Floor, 1 × First Floor, 1 × Second Floor, 1 × Third Floor, 1 × 4BHK, 1 × Fifth Floor, 1 × Sixth Floor, 1 × Seventh Floor, 1 × Eighth Floor
Saleable area
1521–1964 sq mper unit, as filed
Floors
13
Land area
4,579 sq m
Built-up area
24,931 sq m
Road widening
518 sq mland set aside for road widening

Timeline

RERA approvedOct 2022
Proposed completionOct 2025
TodayJul 2026
Construction progress

67.5% overall, as filed

Podiums0%
Stairs & lifts45%
External finishes50%
Internal finishes60%
Flat fit-out60%
OC-readiness60%
Excavation100%
Basement & plinth100%
Stilt floor100%
Superstructure100%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

5 of 13 available
BuildingFloorTypeArea sq mAvailable
JYOTHI OPTIMA1Ground Floor1,5210 of 1
JYOTHI OPTIMA2First Floor1,9640 of 1
JYOTHI OPTIMA3Second Floor1,9640 of 1
JYOTHI OPTIMA4Third Floormortgaged1,9640 of 1
JYOTHI OPTIMA54BHKmortgaged1,9640 of 1
JYOTHI OPTIMA6Fifth Floor1,9600 of 1
JYOTHI OPTIMA7Sixth Floor1,9641 of 1
JYOTHI OPTIMA8Seventh Floor1,9640 of 1
JYOTHI OPTIMA9Eighth Floor1,9640 of 1
JYOTHI OPTIMA10Ninth Floor1,9601 of 1
JYOTHI OPTIMA11Tenth Floor1,9641 of 1
JYOTHI OPTIMA12Eleventh Floor1,9641 of 1
JYOTHI OPTIMA13Tweleth Floor1,9641 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

VAMSIRAM BUILDERS AND DEVELOPERS PRIVATE LIMITED

CompanyPromoter type
Hyderabad, TelanganaBased in
1Projects
1City
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Telangana · Registration filing
Locality
Narsingi
Village
Narsingi
Mandal
Gandipet
District
Ranga Reddy
Pincode
500075
North boundary
100 Feet Wide Hyderabad - Gandipet Main Road
East boundary
40 Feet Wide Road
South boundary
Land in Part of Sy No 158 belongs to the Owners
West boundary
Road
What’s nearby
SchoolsNo schools within 2km
HealthcareNo hospital within 5km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 886 mPrimary road 2.8 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
River 1.8 km · Musi RiverWater body 2.0 km
distances only — not a flood assessment
Government land classification

No residential (House Sites) class on record. The state classes this village’s land as Dry land, Agricultural Land fit for H.S., Land abutting NH/SH/ZPP/MPP. If it’s sold as residential plots, verify the layout’s conversion / approval.

Telangana Registration & Stamps
Declared external development
Green Strip/TOT LO…70%
Fire safety70%
Electricity70%
Water supply65%
Sewerage (Chamber,…65%
Roads60%
Rainwater50%
Rainwater30%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Renewable energy0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisno declared cost on this filing — one government benchmark below

This state’s RERA filing carries no declared build cost at all — nothing to turn into a per-unit or per-sq-ft figure here. The one real, government-sourced number below is the closest thing to a benchmark this record can offer.

Government guidance value
₹47,600/sq ydresidential

₹56,929/sq m · effective May 2026 · apartments ₹6,600/sq ft, same source

The state’s minimum value for this locality’s land, set for stamp duty — a floor, not a market price. Source: Telangana Registration & Stamps.

04

Planning authority

RERA Telangana · Approved building plan

Hyderabad Metropolitan Development Authority (HMDA)

Urban Development Authority
Building Permit no. 005966/BP/HMDA/1169/SKP/2022Survey no. 158

The promised possession date (1 Oct 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

Verify it yourself — look up plan 005966/BP/HMDA/1169/SKP/2022 on the approving authority’s portal to confirm the sanction.

The approving body, at scale

HMDA

Urban Development Authority · Hyderabad metropolitan periphery

Has approved 3,643 RERA projectsabout 1 in 3 in Telangana.

an apartments market72% apartments · 28% plotted layouts. Apartments like yours are this body's core business.

Builders
2,462
On record
3,98,695 flats · 1,96,015 plots
Reach
71 mandals
Since
2016

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.