That initially the building plan was approved on dated 04.08.2022 and the for the betterment of the project the plan was recived on 01.12.2022.
Timeline
Construction startFeb 2023
RERA registeredApr 2023
Proposed completionMar 2027
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
11 units across 11 batches
BuildingTypeArea sq mCount
KANAK GHAR3 BHK (Second Floor, Third Floor)1271
KANAK GHAR3 BHK (Ground, First Floor)1551
KANAK GHAR3 BHK (Fourth Floor, Fifth Floor)1311
KANAK GHAR3 BHK (Fourth Floor, Fifth Floor)2821
KANAK GHAR3 BHK (Second Floor, Third Floor)1311
KANAK GHAR3 BHK (Ground, First Floor)1271
KANAK GHAR3 BHK (Second Floor, Third Floor)1631
KANAK GHAR3 BHK (Fourth Floor, Fifth Floor)1631
KANAK GHAR3 BHK (Ground, First Floor)1631
KANAK GHAR3 BHK (Ground, First Floor)1311
KANAK GHAR3 BHK (Second Floor, Third Floor)1551
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareNearest hospital 2.3km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 6 mPrimary road 6 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 2.9 kmRiver 3.4 km · Ahar
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹5.77 Cr declared to build 11 flats. What that works out to:
₹52.45 Lakhdeclared cost per flatall-in — land + construction
₹2,019/sq ftof built-up area₹21,737/sq m
16%of the cost is land₹1,317/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹12,115per sq yd
₹14,490per sq m
Which rate
residential, interior plot
Matched to
The rate published for “SUKHER”.
Highest rate
₹20,845 per sq yd — the top road-facing rate among the residential rates published for this colony
By the road it faces
interior plot
₹14,490 / sq m
₹12,115 / sq yd
road-facing
₹20,580 / sq m
₹17,208 / sq yd
41–60 ft road
₹22,680 / sq m
₹18,963 / sq yd
61–99 ft road
₹24,930 / sq m
₹20,845 / sq yd
100 ft+ road
₹24,930 / sq m
₹20,845 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this colony.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 19 Apr 2023 · 3 yrs ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
51 residential projects still under way within 25 km. Step out ring by ring:
RAJ-RERA's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/kanak-ghar-girwa-udaipur-amj84xca.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.