Filed by floor and type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
144 units across 104 batches
BuildingFloorTypeArea sq mCount
AGF1 BHK361
AGF1 BHK361
AGF1 BHK371
AGF1 BHK372
AGF1 BHK371
AGF1 BHK371
AGF1 BHK371
AGF1 BHK371
AGF1 BHK381
AGF1 BHK381
AGF1 BHK382
AGF1 BHK391
AGF1 BHK391
AGF2 BHK531
AGF2 BHK561
AGF2 BHK571
AGF2 BHK582
A11 BHK371
A11 BHK381
A11 BHK383
A11 BHK381
A11 BHK383
A11 BHK381
A11 BHK382
A11 BHK391
A11 BHK391
A11 BHK401
A12 BHK531
A12 BHK571
A12 BHK571
A12 BHK582
A21 BHK371
A21 BHK381
A21 BHK383
A21 BHK381
A21 BHK383
A21 BHK381
A21 BHK382
A21 BHK391
A21 BHK391
A21 BHK401
A22 BHK531
A22 BHK571
A22 BHK571
A22 BHK582
A31 BHK351
A31 BHK371
A31 BHK382
A31 BHK383
A31 BHK384
A31 BHK381
A31 BHK391
A31 BHK391
A31 BHK401
A32 BHK531
A32 BHK571
A32 BHK571
A32 BHK581
A32 BHK581
A41 BHK351
A41 BHK371
A41 BHK382
A41 BHK383
A41 BHK384
A41 BHK381
A41 BHK391
A41 BHK391
A41 BHK401
A42 BHK531
A42 BHK571
A42 BHK571
A42 BHK581
A42 BHK581
A51 BHK351
A51 BHK371
A51 BHK382
A51 BHK383
A51 BHK384
A51 BHK381
A51 BHK391
A51 BHK391
A51 BHK401
A52 BHK531
A52 BHK571
A52 BHK571
A52 BHK581
A52 BHK581
A52 BHK371
A61 BHK381
A61 BHK383
A61 BHK381
A61 BHK382
A61 BHK401
A62 BHK531
A62 BHK582
A71 BHK371
A71 BHK371
A71 BHK381
A71 BHK383
A71 BHK381
A71 BHK381
A71 BHK401
A72 BHK531
A72 BHK582
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
876 homes · 65 plotson the public record across 4 projects
11,220 sq mplotted area
23,327 sq mland declared
₹382.68 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 3.8 kmRailway line 4.5 kmRailway station 3.6km away (Vrindavan)Limited bus connectivity nearby
Water & environment
Water body 1.7 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹28.70 Cr declared to build 144 flats. What that works out to:
₹19.93 Lakhdeclared cost per flatall-in — land + construction
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
No building detected within ~40 m of the recorded location in any year from 2016 to 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Apr 2017Feb 2023Apr 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Uttar Pradesh registration department
In Uttar Pradesh it’s called the circle rate.
No government guidance rate is shown for this project.
Uttar Pradesh's government guidance rates aren't in Horizon's record yet.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
06
Planning authority
UP-RERA · Approved building plan
approved 9 May 2018 · 8 yrs ago
Building Permit no. 645
The promised possession date (30 Dec 2024) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 645 on the approving authority’s portal to confirm the approval.
Planning authority — done
07
Complaints & litigation
UP-RERA · public record
Complaints register
None on record with UP-RERA against this project.
Only disputes escalated to the authority appear on the record — a private disagreement never filed here would not. A count from the public record, not a verdict.
What the builder declared
Declared to UP-RERA
Litigation
None declared in this filing
Only what the builder declared, or what UP-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with UP-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
29 residential projects still under way within 25 km. Step out ring by ring:
Of the 69 projects the radar draws within 6 km — every kind, every stage — 19 are residential projects still under way. This list keeps only those, and looks further out.
2 projects within 1 km — showing the nearest 2.
370 m awayResidential
KESHAV MAJESTIC PHASE-4
BRAJ BHOOMI BUILDTECH PVT. LTD · Mathura
4 yr 9 mo
Jan 2026registered
Oct 2030target completion
⚠ no escrow declaredDeclared cost₹300.81 CrScale504 flatsAuthorityUP-RERA
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Uttar Pradesh's published schedules.
06Planning authority
UP-RERA: the approved building plan, as filed.
07Complaints & litigation
UP-RERA's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/keshav-majestic-phase-2-mathura-0vu7g6kp.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.