1.)12.5% of the total saleable plots has been mortgaged by the Jaipur Development Authority, Jaipur against the internal development work of the project those plots are plot no. 7, 8, 21, 22, 41, 42, 43, 65, 66, 90, admeasuring 1432.95 Sq. Mtr. 2.) Open area of our project is 9025.36 sq. mtr. and the same is calculated as हरित उधान (995 sq. mtr.) +सडक (3223.96 sq mtr) + ६०.१८ मी. जेडीए सेक्टर रोड (4806.40 sq. mtr.). 3.) बी.पी.सी. (एल.पी.) की बैठक में लिये गये निर्णय अनुसार इनफॉर्मल कॉमर्शियल भूखण्ड की प्लानिंग मय पाथ-वे/पार्किंग आदेश दिनांक 20.02.2023 एवं बी.पी.सी. (एल.पी.) द्वारा जारी यू.ओ.नोट दिनांक 25.11.2021 के अनुसार की जावेगी। जिसे पृथक से सक्षम स्तर से अनुमोदित करवाया जावेगा.
Timeline
Construction startMay 2024
RERA registeredJun 2024
Proposed completionJul 2025
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
92 plots across 17 batches
TypeArea sq mCount
Plot10266
Plot1021
Plot1496
Plot1581
Plot1265
Plot1532
Plot1931
Plot1351
Plot1811
Plot4001
Plot941
Plot1091
Plot1241
Plot1501
Plot1801
Plot2461
Plot1651
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
HealthcareHospital 698m away · 11 clinics within 1km · Pharmacy within 1km
LifestyleNo parks within 2km · Gym or sports centre 695m away · Swimming pool within 2km
ShoppingSupermarket 709m away
Getting around
Expressway 1.4 km · FlyoverPrimary road 1.6 km · Diggi Malpura RdRailway line 709 mRailway station 862m awayLimited bus connectivity nearby
Water & environment
Canal 2.4 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹16.50 Cr declared to build 92 plots. What that works out to:
₹17.93 Lakhdeclared cost per plotall-in — land + construction
₹770/sq ftof plotted area₹8,291/sq m
82%of the cost is land₹630/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹1,087per sq yd
₹1,300per sq m
Which rate
residential, interior plot
Matched to
The rate published for “HARBANSPURA / RAMGATTA”.
Highest rate
₹1,706 per sq yd — the top road-facing rate among the residential rates published for this colony
By the road it faces
interior plot
₹1,300 / sq m
₹1,087 / sq yd
road-facing
₹1,700 / sq m
₹1,421 / sq yd
41–60 ft road
₹1,870 / sq m
₹1,564 / sq yd
61–99 ft road
₹1,960 / sq m
₹1,639 / sq yd
100 ft+ road
₹2,040 / sq m
₹1,706 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this colony.
This filing declares ₹8,291 per sq m of plotted area — 6.38× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of colony, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Jaipur Development Authority
Development Authority
Layout Permitapproved 28 Jun 2024 · 2 yrs ago
The promised possession date (18 Jul 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Jaipur Development Authority
Development authority
Has approved 644 RERA projects — about 1 in 3 in Rajasthan, more than any other body in the state.
a mixed market — 52% apartments · 48% plotted layouts.
Builders
528
On record
15,937 flats · 30,970 plots
Reach
2 districts
Since
2017
More apartment-heavy than Rajasthan overall — 52% apartments here vs 34% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.