1) As per Township Policy 2010, 9 plots (i.e. plot no. 253, 254, 255, 256, 257, 258, 259, 260, 261) admeasuring 895.90Sq.M. equaling to 12.5% have been kept mortgage Jaipur Development Authority, Jaipur. These plots would be allotted after the internal development work is completed and development charges are deposited with Jaipur Development Authority, Jaipur. 2) The Total Open Area is 5192.62 Square meters consisting of Park/open area 643.18 Sq. Mtr. + Mobile Tower area 10.24 Sq. Mtr. + S.W.M. area 52 Sq. Mtr. + Public Utility area 15.45 Sq. Mtr. + Road area 4471.75 Sq. Mtr. 3) Since it is a plotted development project there is no parking details are required. 4) Plot no. 253, 254, 255, 256, 257, 258, 259, 260, 261got mortgaged free/rehen mukt vide letter dated 21.10.2024 and 16.04.2025
Timeline
Construction startJan 2024
RERA registeredJan 2024
Proposed completionDec 2025
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
62 plots across 30 batches
TypeArea sq mCount
Plot986
Plot937
Plot1351
Plot1421
Plot2741
Plot1611
Plot1251
Plot1511
Plot1711
Plot1441
Plot1101
Plot1251
Plot9310
Plot1711
Plot1041
Plot9312
Plot1351
Plot851
Plot911
Plot1151
Plot1162
Plot1401
Plot791
Plot1481
Plot1241
Plot1501
Plot781
Plot841
Plot901
Plot2041
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
18 homes · 656 plotson the public record across 9 projects
3,063 sq mbuilt-up filed
1,45,185 sq mplotted area
1,45,958 sq mland declared
₹105.53 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
935/352, 937/352, 353 and 357 , KESHYAWALA, Sanganer, Jaipur, 302029
Village
KESHYAWALA
Taluka
Sanganer
District
Jaipur
Pincode
302029
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.9km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 4.2 kmPrimary road 1.3 km · Diggi Malpura RdRailway line 2.9 kmRailway station 3.2km away (Sanganer)Limited bus connectivity nearby
Water & environment
Canal 1.0 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹9.05 Cr declared to build 62 plots. What that works out to:
₹14.60 Lakhdeclared cost per plotall-in — land + construction
₹678/sq ftof plotted area₹7,298/sq m
72%of the cost is land₹491/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹8,194per sq yd
₹9,800per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “KESHYAWALA”.
Highest rate
₹16,254 per sq yd — the top road-facing rate among the 4 residential rates published for this village
By the road it faces
interior plot
₹9,800 / sq m
₹8,194 / sq yd
road-facing
₹16,200 / sq m
₹13,545 / sq yd
41–60 ft road
₹17,820 / sq m
₹14,900 / sq yd
61–99 ft road
₹18,630 / sq m
₹15,577 / sq yd
100 ft+ road
₹19,440 / sq m
₹16,254 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.
This filing declares ₹7,298 per sq m of plotted area — 0.74× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Jaipur Development Authority
Development Authority
Layout Permitapproved 24 Jan 2024 · 2 yrs ago
The promised possession date (31 Dec 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Jaipur Development Authority
Development authority
Has approved 644 RERA projects — about 1 in 3 in Rajasthan, more than any other body in the state.
a mixed market — 52% apartments · 48% plotted layouts.
Builders
528
On record
15,937 flats · 30,970 plots
Reach
2 districts
Since
2017
More apartment-heavy than Rajasthan overall — 52% apartments here vs 34% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.