Complete project overview
HP RERA · Registration filing- Inventory
- 115 units filed
- Declared completion period
- 5 years 0 monthsduration from approval, as filed — no start date is on record
- Registration valid until
- 4 Mar 2027
- Description
- Mashobra Hills project has a total land measuring of 7797.00 Sq. Mtrs. The project in total have 12 Blocks having total 115 dwelling which includes an inventory of Studio Apartments, 1 BHK Apartments, 2 BHK Apartments, 3 Villas. Each block has 4 floors. At the project site presently the brick work has been completed in Block 1 to Block 9 and the roadwork and retaining wall work is being carried in full swing at project site. We are heading to begin the Attic Work of all Blocks in coming days.
- Not provided by the promoter
- Drinking Water Supplysite infrastructure the promoter declared is another party's responsibility — confirm who delivers it
Find your flat
Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Builder’s track record
HP RERA · Promoter registrationM/S RAJDEEP AND COMPANY INFRASTRUCTURE PVT.LTD. THROUGH SH. RAJDEEP SHARMA(MD) AND KRISHAN CHAND ZINTA
The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Location
HP RERA · Registration filing- Site address
- Village-Kunni, Post Office-Mashobra, Shimla, 2 (171007)
- Tehsil
- Shimla(Rural)
- Pincode
- 171007
Planning authority
HP RERA · Approved building planA sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.
Verify it yourself — look up plan 08/2008/21-1169-71 on the approving authority’s portal to confirm the sanction.
What this record cannot tell you
- Build quality — no filing records how well it was actually built.
- Private disputes — only complaints escalated to the authority appear here.
- What it will be worth — the record is the past; it does not price the future.
- Construction progress — HP RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
- Complaints — HP RERA does not publish a complaints register. This read cannot speak to them either way.