Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Director, Town and Country PlanningTown & Country Planning (DTCP)this project1 of 2 projects
Vice Chairman, UDAUrban Development Authority1 of 2 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 271 mPrimary road 260 m · Chittoor - Aragonda - Paturu RoadRailway line 2.4 kmRailway station 3.2km away (Chittoor)Limited bus connectivity nearby
Water & environment
Water body 895 mRiver 2.4 km · Neva River
distances only — not a flood assessment
Government land classification
Land here includes House Sites (residential), plus Agricultural Land fit for H.S.. The state classes land per survey— confirm your plot’s survey number is House Sites.
AP Registration & Stamps
Declared external development
Roads40%
Water supply40%
Sewage40%
Electricity40%
Water40%
Renewable energy40%
Solid waste0%
Fire safety0%
Emergency exits0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisdeclared build cost — not a sale price
₹1.87 Cr declared to build 59 plots. What that works out to:
₹3.17 Lakhdeclared cost per plotall-in — land + construction
₹177/sq ftof plotted area₹1,905/sq m
41%of the cost is land₹37/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
AP Registration & Stamps
In Andhra Pradesh it’s called the market value — the registration department's figure, not a sale price.
₹5,500per sq yd
₹6,578per sq m
Which rate
House Sites
Matched to
The rate published for the village of “MANGASAMUDRAM(RURAL)”.
In force
effective Feb 2025
Last revision
Up from ₹5,000 per sq yd
This filing declares ₹1,905 per sq m of plotted area — 0.29× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Andhra Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Andhra Pradesh · Approved building plan
Director, Town and Country Planning
Town & Country Planning (DTCP) · MANGASAMUDRAM VILLAGE CHITTOOR
The promised possession date (25 Feb 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 1008/0002/LP/CHTR/2019 on the approving authority’s portal (dtcp.ap.gov.in) to confirm the approval.
The approving body, at scale
Director, Town & Country Planning (DTCP)
Andhra Pradesh's statewide town-planning directorate. It has approved 1,597 RERA projects across 13 mandals — about 1 in 4 in Andhra Pradesh.
This project sits in its MANGASAMUDRAM VILLAGE CHITTOOR area — a smaller local market, with too few RERA projects on record to profile on its own.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Andhra Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Andhra Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Andhra Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Andhra Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
6 plotted projects still under way within 25 km. Step out ring by ring: