16 homes · 340 plotson the public record across 6 projects
29,258 sq mbuilt-up filed
56,997 sq mplotted area
1,42,635 sq mland declared
₹79.28 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Planning authoritiesthis builder's portfolio, by approving body
Vice Chairman, UDAUrban Development Authority4 of 6 projects
Commissioner, ULBMunicipal / Corporationthis project1 of 6 projects
Director, Town and Country PlanningTown & Country Planning (DTCP)1 of 6 projects
Counts are how many of this builder’s projects on Horizon’s record were approved by each body — a footprint, not a ranking of the authorities.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 365 m · National Highway 140Railway line 969 mNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 1.3 kmRiver 1.5 km · Pedda Vanka
distances only — not a flood assessment
Government land classification
No residential (House Sites) class on record. The state classes this village’s land as Agricultural Land fit for H.S., Land abutting NH/SH/ZPP/MPP. If it’s sold as residential plots, verify the layout’s conversion / approval.
AP Registration & Stamps
Declared external development
Roads0%
Water supply0%
Sewage0%
Electricity0%
Solid waste0%
Fire safety0%
Water0%
Emergency exits0%
Renewable energy0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisdeclared build cost — not a sale price
₹1.62 Cr declared to build 26 plots. What that works out to:
₹6.22 Lakhdeclared cost per plotall-in — land + construction
₹394/sq ftof plotted area₹4,238/sq m
65%of the cost is land₹112/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
No building detected within ~40 m of the recorded location in any year from 2016 to 2023.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Feb 2017Mar 2023Apr 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
No building is visible in this circle through 2023. That is what the imagery shows, not a statement about the project’s progress.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
Andhra Pradesh registration department
In Andhra Pradesh it’s called the market value — the registration department's figure, not a sale price.
No government guidance rate is shown for this project.
Andhra Pradesh's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
The promised possession date (20 Sep 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 22/2022/1175/DTCP/DPMS on the approving authority’s portal to confirm the approval.
The approving body, at scale
Chittor
Municipal Corporation
Has approved 7 RERA projects — 0.1% of Andhra Pradesh.
a mixed market — 57% apartments · 43% plotted layouts.
Builders
7
On record
2,006 flats · 153 plots
Reach
4 mandals
Since
2019
More layout-heavy than Andhra Pradesh overall — 43% plots here vs 26% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Planning authority — done
07
Complaints & litigation
RERA Andhra Pradesh · public record
Complaints register
Not published. RERA Andhra Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Andhra Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Andhra Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Andhra Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within 25 km
7 plotted projects still under way within 25 km. Step out ring by ring:
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
No government guidance rate could be matched to this project from Andhra Pradesh's published schedules.
06Planning authority
RERA Andhra Pradesh: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
RERA Andhra Pradesh's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/mgb-maharshi-gardens-vepanapalle-puthalapattu-oe0hc254.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.