Timeline

Project startedNov 2017
RERA registeredMay 2018
Proposed completionSep 2022
TodayJul 2026
Construction progress

0% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your plot

Filed by type and size, in the batches the promoter registered — not a per-plot listing. Look yours up.

281 plots across 1 batch
TypeArea sq mCount
Plot85281

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Promoter registration

MANGALAM ENTERPRISE

PARTNERSHIP FIRMPromoter type
Surat, GujaratBased in
1Projects
1City
2018–2022Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Olpad
District
Surat
Pincode
394540
Address
R. S. NO.129, 130/2, 131/1+2 AND 7BLOCK NO: 135/2, MOJE: ASNABAD, OLPAD
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.8km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Primary road 284 m · SH6No metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 1.6 kmCanal 3.7 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹9.29 Cr declared to build 281 plots. What that works out to:

₹3.60 Lakh – ₹7.71 Lakhdeclared unit pricerange on the filing — not a live asking price
₹3.30 Lakhdeclared cost per plotall-in — land + construction
₹191/sq ftof plotted area₹2,053/sq m
57%of the cost is land₹109/sq ft of land

This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Planning authority

GujRERA · Approved building plan

town planning and Valuation Department, Surat

Layout Permitapproved 28 May 2018 · 8 yrs ago

The promised possession date (30 Sep 2022) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

Building-Use (BU) permission — the occupancy sign-off, on record

All 1 block carry a Building-Use (BU) permission (latest 22 Jun 2020)— Gujarat’s legal-to-occupy sign-off, and the completion proof most RERA records simply don’t carry. Still confirm the BU covers your specific unit before you rely on it.

The approving body, at scale

The approving authority

The body that sanctioned this project. It has approved 2,653 RERA projects across 26 talukas about 1 in 6 in Gujarat.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — GujRERA does not publish a complaints register. This read cannot speak to them either way.