Complete project overview

RERA Telangana · Registration filing
Units
45 units
Unit mix
38 × 2BHK, 5 × 3BHK, 2 × Doubloe Bedroom
Saleable area
104–194 sq mper unit, as filed
Floors
5
Land area
2,495 sq m
Built-up area
6,548 sq m

Timeline

RERA approvedOct 2021
Proposed completionOct 2027
TodayJul 2026
Construction progress

0% overall, as filed

Excavation0%
Basement & plinth0%
Podiums0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

45 of 45 available
BuildingFloorTypeArea sq mAvailable
NSR CONSTRUCTIONS12BHK1242 of 2
NSR CONSTRUCTIONS12BHK1242 of 2
NSR CONSTRUCTIONS12BHK1262 of 2
NSR CONSTRUCTIONS13BHK1941 of 1
NSR CONSTRUCTIONS12BHK1042 of 2
NSR CONSTRUCTIONS22BHK1242 of 2
NSR CONSTRUCTIONS22BHK1242 of 2
NSR CONSTRUCTIONS22BHK1262 of 2
NSR CONSTRUCTIONS23BHK1941 of 1
NSR CONSTRUCTIONS22BHK1042 of 2
NSR CONSTRUCTIONS32BHK1242 of 2
NSR CONSTRUCTIONS32BHK1242 of 2
NSR CONSTRUCTIONS32BHK1262 of 2
NSR CONSTRUCTIONS33BHK1941 of 1
NSR CONSTRUCTIONS32BHK1042 of 2
NSR CONSTRUCTIONS42BHK1242 of 2
NSR CONSTRUCTIONS4Doubloe Bedroom1242 of 2
NSR CONSTRUCTIONS42BHK1262 of 2
NSR CONSTRUCTIONS43BHK1941 of 1
NSR CONSTRUCTIONS42BHK1042 of 2
NSR CONSTRUCTIONS52BHKmortgaged1242 of 2
NSR CONSTRUCTIONS52BHKmortgaged1242 of 2
NSR CONSTRUCTIONS52BHK1262 of 2
NSR CONSTRUCTIONS53BHK1941 of 1
NSR CONSTRUCTIONS52BHKmortgaged1042 of 2

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

NSR CONSTRUCTIONS

PartnershipPromoter type
Warangal Rural, TelanganaBased in
1Projects
1City
2021–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
MULUGU ROAD
Mandal
Hanamkonda
District
Warangal Urban
Pincode
506006
North boundary
LAND OF SHASHIDHAR
East boundary
LAND OF VENDORS
South boundary
LAND OF RADHA
West boundary
12 MT WIDE ROAD
What’s nearby
SchoolsNearest school 1.5km away · College or university 758m away · Library 776m away
HealthcareHospital 999m away · Clinic within 2km
LifestylePark 1.3km away
ShoppingSupermarket 1.0km away · Mall 1.4km away · Bank 956m away
Getting around
Expressway 1.2 kmPrimary road 412 mRailway line 3.4 kmRailway station 3.6km away (Warangal)Limited bus connectivity nearby
Water & environment
Water body 714 mCanal 1.3 km
distances only — not a flood assessment
Declared external development
Roads0%
Water supply0%
Sewerage (Chamber,…0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan

Directorate of Town & Country Planning (DTCP)

Town & Country Planning (DTCP)
Building Permit
Survey no. 698&699
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

DTCP

Town & Country Planning · towns & district HQs across Telangana

Has approved 3,737 RERA projectsabout 1 in 3 in Telangana, more than any other body in the state.

a plotted-layout market32% apartments · 68% plotted layouts. Apartments like yours are the smaller share here — this body mostly approves plotted layouts.

Builders
2,933
On record
41,686 flats · 4,33,404 plots
Reach
287 mandals
Since
2012

More layout-heavy than Telangana overall — 68% plots here vs 34% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.