Complete project overview

RERA Telangana · Registration filing
Units
180 units
Unit mix
175 × 2BHK, 5 × 3BHK
Saleable area
134–2053 sq mper unit, as filed
Floors
5
Land area
10,064 sq m
Built-up area
24,201 sq m
Road widening
737 sq mland set aside for road widening

Timeline

RERA approvedMar 2019
Proposed completionMar 2023
TodayJul 2026
Construction progress

100% overall, as filed

Excavation100%
Basement & plinth100%
Podiums100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

180 of 180 available
BuildingFloorTypeArea sq mAvailable
PALLAVA RESIDENCY12BHK2,05320 of 20
PALLAVA RESIDENCY12BHK1,71415 of 15
PALLAVA RESIDENCY13BHK1341 of 1
PALLAVA RESIDENCY22BHKmortgaged2,05320 of 20
PALLAVA RESIDENCY22BHKmortgaged2292 of 2
PALLAVA RESIDENCY22BHK1,48613 of 13
PALLAVA RESIDENCY23BHK1341 of 1
PALLAVA RESIDENCY32BHK2,05320 of 20
PALLAVA RESIDENCY32BHK1,71415 of 15
PALLAVA RESIDENCY33BHK1341 of 1
PALLAVA RESIDENCY42BHK2,05320 of 20
PALLAVA RESIDENCY42BHK1,71415 of 15
PALLAVA RESIDENCY43BHK1341 of 1
PALLAVA RESIDENCY52BHK2,05320 of 20
PALLAVA RESIDENCY52BHK1,71415 of 15
PALLAVA RESIDENCY53BHK1341 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

PALLAVA DEVELOPERS

PartnershipPromoter type
Hyderabad, TelanganaBased in
2Projects
1City
2019–2026Active
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
230 homeson the public record across 2 projects
28,825 sq mbuilt-up filed
12,853 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
POTHREDDIPALLE
Village
POTHREDDIPALLE
Mandal
SANGAREDDY
District
Sangareddy
Pincode
502295
North boundary
NATIONAL HIGHWAY
East boundary
SURVEY NUMBER 150
South boundary
LAND OF YADHI REDDY
West boundary
LAND OF NAGI REDDY AND OTHERS
What’s nearby
SchoolsNearest school 1.4km away
HealthcareHospital 298m away · 1 clinic within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 1.7km away
Getting around
Expressway 206 mPrimary road 369 m · Old National Highway 161No metro or railway within 5kmBus stop within 500m
Water & environment
Water body 1.0 km
distances only — not a flood assessment
Government land classification

No residential (House Sites) class on record. The state classes this village’s land as Dry land, Wet Land double crop. If it’s sold as residential plots, verify the layout’s conversion / approval.

Telangana Registration & Stamps
Declared external development
Roads0%
Water supply0%
Sewerage (Chamber,…0%
Rainwater0%
Green Strip/TOT LO…0%
Street lighting0%
Community Building…0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan

Hyderabad Metropolitan Development Authority (HMDA)

Urban Development Authority
Building Permit
Survey no. 150/AA

The promised possession date (31 Mar 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

HMDA

Urban Development Authority · Hyderabad metropolitan periphery

Has approved 3,643 RERA projectsabout 1 in 3 in Telangana.

an apartments market72% apartments · 28% plotted layouts. Apartments like yours are this body's core business.

Builders
2,462
On record
3,98,695 flats · 1,96,015 plots
Reach
71 mandals
Since
2016

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.