HORIZONMarkets
01

Complete project overview

RERA Telangana · Registration filing
Units
314 units
Unit mix
222 × 3BHK, 88 × 2BHK, 4 × Amenities
Saleable area
118–244 sq mper unit, as filed
Floors
10
Buildings
4
Land area
13,051 sq m
Built-up area
42,665 sq m

Timeline

RERA approvedJan 2023
Proposed completionJan 2029
TodayJul 2026
Construction progress

0% overall, as filed

Excavation0%
Basement & plinth0%
Podiums0%
Stilt floor0%
Superstructure0%
Internal finishes0%
Flat fit-out0%
Stairs & lifts0%
External finishes0%
OC-readiness0%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

257 of 314 available
BuildingFloorTypeArea sq mAvailable
PGR ELIRA BLOCK 113BHK1361 of 1
PGR ELIRA BLOCK 113BHK1431 of 1
PGR ELIRA BLOCK 113BHK1741 of 1
PGR ELIRA BLOCK 113BHK1701 of 1
PGR ELIRA BLOCK 113BHK1841 of 1
PGR ELIRA BLOCK 113BHK1951 of 1
PGR ELIRA BLOCK 113BHK2001 of 1
PGR ELIRA BLOCK 113BHK2101 of 1
PGR ELIRA BLOCK 113BHK1551 of 1
PGR ELIRA BLOCK 113BHK1741 of 1
PGR ELIRA BLOCK 123BHKmortgaged1551 of 1
PGR ELIRA BLOCK 123BHKmortgaged2001 of 1
PGR ELIRA BLOCK 123BHKmortgaged1611 of 1
PGR ELIRA BLOCK 123BHKmortgaged1641 of 1
PGR ELIRA BLOCK 123BHKmortgaged1981 of 1
PGR ELIRA BLOCK 123BHKmortgaged1941 of 1
PGR ELIRA BLOCK 123BHKmortgaged1931 of 1
PGR ELIRA BLOCK 123BHKmortgaged2041 of 1
PGR ELIRA BLOCK 123BHKmortgaged2091 of 1
PGR ELIRA BLOCK 123BHKmortgaged2201 of 1
PGR ELIRA BLOCK 133BHKmortgaged1551 of 1
PGR ELIRA BLOCK 133BHKmortgaged2001 of 1
PGR ELIRA BLOCK 133BHKmortgaged1611 of 1
PGR ELIRA BLOCK 133BHKmortgaged1641 of 1
PGR ELIRA BLOCK 133BHKmortgaged1981 of 1
PGR ELIRA BLOCK 133BHKmortgaged1941 of 1
PGR ELIRA BLOCK 133BHKmortgaged1931 of 1
PGR ELIRA BLOCK 133BHKmortgaged2041 of 1
PGR ELIRA BLOCK 133BHKmortgaged2091 of 1
PGR ELIRA BLOCK 133BHKmortgaged2201 of 1
PGR ELIRA BLOCK 143BHK1551 of 1
PGR ELIRA BLOCK 143BHK2001 of 1
PGR ELIRA BLOCK 143BHK1611 of 1
PGR ELIRA BLOCK 143BHK1641 of 1
PGR ELIRA BLOCK 143BHK1981 of 1
PGR ELIRA BLOCK 143BHK1941 of 1
PGR ELIRA BLOCK 143BHK1931 of 1
PGR ELIRA BLOCK 143BHK2041 of 1
PGR ELIRA BLOCK 143BHK2200 of 1
PGR ELIRA BLOCK 143BHK2090 of 1
PGR ELIRA BLOCK 153BHK1611 of 1
PGR ELIRA BLOCK 153BHK1641 of 1
PGR ELIRA BLOCK 153BHK1981 of 1
PGR ELIRA BLOCK 153BHK1931 of 1
PGR ELIRA BLOCK 153BHK2041 of 1
PGR ELIRA BLOCK 153BHK2091 of 1
PGR ELIRA BLOCK 153BHK2201 of 1
PGR ELIRA BLOCK 153BHK1550 of 1
PGR ELIRA BLOCK 153BHK1940 of 1
PGR ELIRA BLOCK 153BHK2000 of 1
PGR ELIRA BLOCK 163BHK1551 of 1
PGR ELIRA BLOCK 163BHK1611 of 1
PGR ELIRA BLOCK 163BHK1641 of 1
PGR ELIRA BLOCK 163BHK1981 of 1
PGR ELIRA BLOCK 163BHK1941 of 1
PGR ELIRA BLOCK 163BHK1931 of 1
PGR ELIRA BLOCK 163BHK2041 of 1
PGR ELIRA BLOCK 163BHK2091 of 1
PGR ELIRA BLOCK 163BHK2200 of 1
PGR ELIRA BLOCK 163BHK2000 of 1
PGR ELIRA BLOCK 173BHK1641 of 1
PGR ELIRA BLOCK 173BHK1981 of 1
PGR ELIRA BLOCK 173BHK1941 of 1
PGR ELIRA BLOCK 173BHK1931 of 1
PGR ELIRA BLOCK 173BHK2041 of 1
PGR ELIRA BLOCK 173BHK2091 of 1
PGR ELIRA BLOCK 173BHK2201 of 1
PGR ELIRA BLOCK 173BHK1550 of 1
PGR ELIRA BLOCK 173BHK2000 of 1
PGR ELIRA BLOCK 173BHK1610 of 1
PGR ELIRA BLOCK 183BHK1551 of 1
PGR ELIRA BLOCK 183BHK2001 of 1
PGR ELIRA BLOCK 183BHK1611 of 1
PGR ELIRA BLOCK 183BHK1641 of 1
PGR ELIRA BLOCK 183BHK1981 of 1
PGR ELIRA BLOCK 183BHK1941 of 1
PGR ELIRA BLOCK 183BHK1931 of 1
PGR ELIRA BLOCK 183BHK2041 of 1
PGR ELIRA BLOCK 183BHK2091 of 1
PGR ELIRA BLOCK 183BHK2201 of 1
PGR ELIRA BLOCK 193BHK1551 of 1
PGR ELIRA BLOCK 193BHK2001 of 1
PGR ELIRA BLOCK 193BHK1611 of 1
PGR ELIRA BLOCK 193BHK1641 of 1
PGR ELIRA BLOCK 193BHK1681 of 1
PGR ELIRA BLOCK 193BHK1941 of 1
PGR ELIRA BLOCK 193BHK1931 of 1
PGR ELIRA BLOCK 193BHK2041 of 1
PGR ELIRA BLOCK 193BHK2091 of 1
PGR ELIRA BLOCK 193BHK2201 of 1
PGR ELIRA BLOCK 1103BHK1551 of 1
PGR ELIRA BLOCK 1103BHK2001 of 1
PGR ELIRA BLOCK 1103BHK1611 of 1
PGR ELIRA BLOCK 1103BHK1641 of 1
PGR ELIRA BLOCK 1103BHK1981 of 1
PGR ELIRA BLOCK 1103BHK1941 of 1
PGR ELIRA BLOCK 1103BHK1931 of 1
PGR ELIRA BLOCK 1103BHK2041 of 1
PGR ELIRA BLOCK 1103BHK2091 of 1
PGR ELIRA BLOCK 1103BHK2201 of 1
PGR ELIRA BLOCK 212BHK1182 of 2
PGR ELIRA BLOCK 212BHK1211 of 1
PGR ELIRA BLOCK 213BHK1341 of 1
PGR ELIRA BLOCK 212BHK1202 of 2
PGR ELIRA BLOCK 212BHK1183 of 3
PGR ELIRA BLOCK 212BHK1201 of 1
PGR ELIRA BLOCK 222BHK1382 of 2
PGR ELIRA BLOCK 222BHK1291 of 1
PGR ELIRA BLOCK 222BHK1292 of 2
PGR ELIRA BLOCK 222BHK1273 of 3
PGR ELIRA BLOCK 222BHK1291 of 1
PGR ELIRA BLOCK 223BHK1441 of 1
PGR ELIRA BLOCK 232BHK1382 of 2
PGR ELIRA BLOCK 232BHK1291 of 1
PGR ELIRA BLOCK 232BHK1292 of 2
PGR ELIRA BLOCK 232BHK1273 of 3
PGR ELIRA BLOCK 232BHK1291 of 1
PGR ELIRA BLOCK 233BHK1440 of 1
PGR ELIRA BLOCK 242BHK1382 of 2
PGR ELIRA BLOCK 242BHK1291 of 1
PGR ELIRA BLOCK 242BHK1292 of 2
PGR ELIRA BLOCK 242BHK1273 of 3
PGR ELIRA BLOCK 242BHK1291 of 1
PGR ELIRA BLOCK 243BHK1440 of 1
PGR ELIRA BLOCK 252BHK1381 of 2
PGR ELIRA BLOCK 252BHK1291 of 1
PGR ELIRA BLOCK 252BHK1291 of 2
PGR ELIRA BLOCK 252BHK1272 of 3
PGR ELIRA BLOCK 252BHK1291 of 1
PGR ELIRA BLOCK 253BHK1440 of 1
PGR ELIRA BLOCK 262BHK1382 of 2
PGR ELIRA BLOCK 262BHK1291 of 2
PGR ELIRA BLOCK 262BHK1271 of 3
PGR ELIRA BLOCK 262BHK1291 of 1
PGR ELIRA BLOCK 262BHK1290 of 1
PGR ELIRA BLOCK 263BHK1440 of 1
PGR ELIRA BLOCK 272BHK1381 of 2
PGR ELIRA BLOCK 272BHK1291 of 1
PGR ELIRA BLOCK 272BHK1291 of 2
PGR ELIRA BLOCK 272BHK1273 of 3
PGR ELIRA BLOCK 272BHK1291 of 1
PGR ELIRA BLOCK 273BHK1440 of 1
PGR ELIRA BLOCK 282BHK1382 of 2
PGR ELIRA BLOCK 282BHK1291 of 1
PGR ELIRA BLOCK 282BHK1291 of 2
PGR ELIRA BLOCK 282BHK1273 of 3
PGR ELIRA BLOCK 282BHK1291 of 1
PGR ELIRA BLOCK 283BHK1441 of 1
PGR ELIRA BLOCK 292BHK1381 of 2
PGR ELIRA BLOCK 293BHK1440 of 1
PGR ELIRA BLOCK 292BHK1291 of 1
PGR ELIRA BLOCK 293BHK1291 of 1
PGR ELIRA BLOCK 292BHK1273 of 3
PGR ELIRA BLOCK 292BHK1290 of 1
PGR ELIRA BLOCK 293BHK1290 of 1
PGR ELIRA BLOCK 2102BHK1291 of 2
PGR ELIRA BLOCK 2102BHK1273 of 3
PGR ELIRA BLOCK 2102BHK1291 of 1
PGR ELIRA BLOCK 2103BHK1440 of 1
PGR ELIRA BLOCK 2102BHK1381 of 2
PGR ELIRA BLOCK 2102BHK1291 of 1
PGR ELIRA BLOCK 313BHKmortgaged2005 of 5
PGR ELIRA BLOCK 313BHKmortgaged1951 of 1
PGR ELIRA BLOCK 313BHK1743 of 3
PGR ELIRA BLOCK 313BHK1851 of 1
PGR ELIRA BLOCK 313BHK1361 of 1
PGR ELIRA BLOCK 323BHKmortgaged2441 of 1
PGR ELIRA BLOCK 323BHKmortgaged1971 of 1
PGR ELIRA BLOCK 323BHK1971 of 1
PGR ELIRA BLOCK 323BHKmortgaged1591 of 1
PGR ELIRA BLOCK 323BHKmortgaged2181 of 1
PGR ELIRA BLOCK 323BHKmortgaged2251 of 1
PGR ELIRA BLOCK 323BHKmortgaged2091 of 1
PGR ELIRA BLOCK 323BHK2041 of 1
PGR ELIRA BLOCK 323BHK2091 of 1
PGR ELIRA BLOCK 323BHKmortgaged1971 of 1
PGR ELIRA BLOCK 323BHKmortgaged2191 of 1
PGR ELIRA BLOCK 333BHK1971 of 1
PGR ELIRA BLOCK 333BHK2251 of 1
PGR ELIRA BLOCK 333BHK2091 of 2
PGR ELIRA BLOCK 333BHK2440 of 1
PGR ELIRA BLOCK 333BHK1970 of 2
PGR ELIRA BLOCK 333BHK1590 of 1
PGR ELIRA BLOCK 333BHK2190 of 1
PGR ELIRA BLOCK 333BHK2040 of 1
PGR ELIRA BLOCK 333BHK2181 of 1
PGR ELIRA BLOCK 343BHK1972 of 2
PGR ELIRA BLOCK 343BHK1591 of 1
PGR ELIRA BLOCK 343BHK1971 of 1
PGR ELIRA BLOCK 343BHK2181 of 1
PGR ELIRA BLOCK 343BHK2251 of 1
PGR ELIRA BLOCK 343BHK2092 of 2
PGR ELIRA BLOCK 343BHK2041 of 1
PGR ELIRA BLOCK 343BHK2440 of 1
PGR ELIRA BLOCK 343BHK2190 of 1
PGR ELIRA BLOCK 353BHK2441 of 1
PGR ELIRA BLOCK 353BHK1972 of 2
PGR ELIRA BLOCK 353BHK1591 of 1
PGR ELIRA BLOCK 353BHK1971 of 1
PGR ELIRA BLOCK 353BHK2181 of 1
PGR ELIRA BLOCK 353BHK2251 of 1
PGR ELIRA BLOCK 353BHK2092 of 2
PGR ELIRA BLOCK 353BHK2041 of 1
PGR ELIRA BLOCK 353BHK2191 of 1
PGR ELIRA BLOCK 363BHK2441 of 1
PGR ELIRA BLOCK 363BHK1972 of 2
PGR ELIRA BLOCK 363BHK1591 of 1
PGR ELIRA BLOCK 363BHK1971 of 1
PGR ELIRA BLOCK 363BHK2181 of 1
PGR ELIRA BLOCK 363BHK2251 of 1
PGR ELIRA BLOCK 363BHK2041 of 1
PGR ELIRA BLOCK 363BHK2091 of 2
PGR ELIRA BLOCK 363BHK2191 of 1
PGR ELIRA BLOCK 373BHK2441 of 1
PGR ELIRA BLOCK 373BHK1972 of 2
PGR ELIRA BLOCK 373BHK1971 of 1
PGR ELIRA BLOCK 373BHK2181 of 1
PGR ELIRA BLOCK 373BHK2251 of 1
PGR ELIRA BLOCK 373BHK2091 of 2
PGR ELIRA BLOCK 373BHK2191 of 1
PGR ELIRA BLOCK 373BHK1590 of 1
PGR ELIRA BLOCK 373BHK2040 of 1
PGR ELIRA BLOCK 383BHK2441 of 1
PGR ELIRA BLOCK 383BHK2180 of 1
PGR ELIRA BLOCK 383BHK2040 of 1
PGR ELIRA BLOCK 383BHK1970 of 2
PGR ELIRA BLOCK 383BHK2091 of 2
PGR ELIRA BLOCK 383BHK1971 of 1
PGR ELIRA BLOCK 383BHK2251 of 1
PGR ELIRA BLOCK 383BHK2191 of 1
PGR ELIRA BLOCK 383BHK1590 of 1
PGR ELIRA BLOCK 393BHK1971 of 1
PGR ELIRA BLOCK 393BHK2181 of 1
PGR ELIRA BLOCK 393BHK2250 of 1
PGR ELIRA BLOCK 393BHK2092 of 2
PGR ELIRA BLOCK 393BHK2041 of 1
PGR ELIRA BLOCK 393BHK1972 of 2
PGR ELIRA BLOCK 393BHK1590 of 1
PGR ELIRA BLOCK 393BHK2440 of 1
PGR ELIRA BLOCK 393BHK2190 of 1
PGR ELIRA BLOCK 3103BHK1971 of 2
PGR ELIRA BLOCK 3103BHK2191 of 1
PGR ELIRA BLOCK 3103BHK1971 of 1
PGR ELIRA BLOCK 3103BHK2181 of 1
PGR ELIRA BLOCK 3103BHK2251 of 1
PGR ELIRA BLOCK 3103BHK2092 of 2
PGR ELIRA BLOCK 3103BHK2041 of 1
PGR ELIRA BLOCK 3103BHK1591 of 1
PGR ELIRA BLOCK 3103BHK2440 of 1
PGR ELIRA CLUB HOUSE1Amenities01 of 1
PGR ELIRA CLUB HOUSE2Amenities01 of 1
PGR ELIRA CLUB HOUSE3Amenities01 of 1
PGR ELIRA CLUB HOUSE4Amenities01 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

PGR BUILDERS

PartnershipPromoter type
Ranga Reddy, TelanganaBased in
4Projects
1City
2017–presentActive
Timelineevery project, start → promised completion
Builder DNAthe whole portfolio, summed
439 homeson the public record across 4 projects
58,798 sq mbuilt-up filed
19,427 sq mland declared

These are sums of what the promoter has put on the public record across their projects — a sense of how big a builder this is, not build quality and not whether they finish on time.

Every project Horizon has read from this promoter, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Telangana · Registration filing
Locality
HYDERGUDA,RAJENDRANAGAR,HYDERABAD
Village
Hyderguda
Mandal
Rajendranagar
District
Ranga Reddy
Pincode
500048
North boundary
40 FEET WIDE ROAD
East boundary
NEIGHBOURS LAND
South boundary
JANAPRIYA UTOPIA APARTMENTS
West boundary
KARNI TESORO VILLAS AND LEGEND HORIZON
What’s nearby
Schools1 school within 500m · 3 educational institutions within 1km · College or university 595m away
HealthcareHospital 458m away · 1 clinic within 1km · Doctor's clinic within 1km
LifestylePark 533m away · Gym or sports centre 583m away · 3 restaurants and cafes within 1km
ShoppingSupermarket 604m away
Getting around
Expressway 1.0 km · Langar House FlyoverPrimary road 480 m · Inner Ring RoadRailway line 5.0 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 481 m
distances only — not a flood assessment
Declared external development
Sewerage (Chamber,…50%
Rainwater50%
Community Building…25%
Roads0%
Water supply0%
Green Strip/TOT LO…0%
Street lighting0%
Sewage0%
Solid waste0%
Rainwater0%
Renewable energy0%
Fire safety0%
Electricity0%
Aggregate area of …0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisno declared cost on this filing — one government benchmark below

This state’s RERA filing carries no declared build cost at all — nothing to turn into a per-unit or per-sq-ft figure here. The one real, government-sourced number below is the closest thing to a benchmark this record can offer.

Government guidance value
₹30,500/sq ydresidential

₹36,478/sq m · effective May 2026 · apartments ₹3,000/sq ft, same source

The state’s minimum value for this locality’s land, set for stamp duty — a floor, not a market price. Source: Telangana Registration & Stamps.

04

Planning authority

RERA Telangana · Approved building plan

Greater Hyderabad Municipal Corporation (GHMC)

Municipal / Corporation
Building Permit
Survey no. 204/1 (OLD NO. 204), 205/A1/1 (OLD NO.205/A/1), 206/A1/1 (OLD NO.206/A/1),205/A2/1(OLD NO.205/A2),206/A3/1 (OLD NO.206/A2),205/A3/1 (OLD NO.205/A3),206/A2/1,(OLD NO.206/A3),205/A1/1, (OLD NO.205/A),206/A1/1 (OLD NO.206/A),206/A2/1 (OLD NO.206/A)
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

GHMC

Municipal Corporation · Hyderabad city core

Has approved 3,102 RERA projectsabout 1 in 4 in Telangana.

an apartments market99% apartments · 1% plotted layouts. Apartments like yours are this body's core business.

Builders
1,994
On record
2,20,211 flats · 3,387 plots
Reach
65 mandals
Since
2016

More apartment-heavy than Telangana overall — 99% apartments here vs 66% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.