R-Tech Emporio

RAJ/P/2022/2077 · RAJ-RERA · https://gethorizon.in/projects/r-tech-emporio-sanganer-jaipur-0u9mzs4x

01

Complete project overview

RAJ-RERA · Registration filing
Land area
3,643 sq m
Description
• In proposed project, currently total no. of 04 floors (including Ground + 3 Floors) are sanctioned vide letter dated 07-07-2022 by Jaipur Development Authority. • Promoter & Landowner intends to construct extra 1 (one) floor if necessary permission & approval is received from concerned authority. • The promoter intends to obtain permission from the competent authority for remaining floor in the future & will intimate Raj. RERA Authority as & when the permission is obtained.

Timeline

Construction startJul 2022
RERA registeredJul 2022
Proposed completionJul 2025
TodaySep 2026
02

Builder’s track record

RAJ-RERA · Builder registration

R-TECH EMPORIO VENTURE

OrganisationPromoter type
Jaipur, RajasthanBased in
1Projects
1City
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RAJ-RERA · Registration filing
Address
Plot No. 179 to 183, Sumer Nagar Extension, Q Block, Village-Balrampura urf Khejaro Ka Bass, Sanganer, Jaipur, 302020
Village
Village-Balrampura urf Khejaro Ka Bass
Taluka
Sanganer
District
Jaipur
Pincode
302020
What’s nearby
Schools1 school within 1km · College or university 1.6km away
HealthcareHospital 544m away · 3 clinics within 1km
LifestylePark 1.6km away
ShoppingNo supermarket within 2km · Bank 317m away
Getting around
Expressway 463 mPrimary road 2.5 kmRailway line 3.5 kmMetro station 2.5km away (Manasarovar)Limited bus connectivity nearby
Water & environment
Water body 2.1 km · Dravyavati River
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹66.00 Cr declared. What that works out to:

47%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Rajasthan IGRS — DLC rates (rural branch)

In Rajasthan it’s called the DLC rate.

₹585per sq yd
₹700per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “Balrampura”.

What this number is — and isn’t

  • The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
05

Planning authority

RAJ-RERA · Approved building plan
Building Permitapproved 26 Jul 2022 · 4 yrs ago

The promised possession date (31 Jul 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

07

Other projects nearby

The register · within 25 km

15 commercial projects still under way within 25 km. Step out ring by ring:

2 projects between 1 and 3 km — showing the nearest 2.

SanganerCommercial

STRIDE TOWER

DRAUPADI DEVI SUROLIA

Jan 2026registered
Dec 2027target completion
Declared cost₹25.00 CrScale7 flatsAuthorityRAJ-RERA
JaipurCommercial

SSBC JKD ELEVATE

Pelikan Buildcon LLP

Apr 2024registered
Aug 2027target completion
Declared cost₹95.00 CrScale126 flatsAuthorityRAJ-RERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RAJ-RERA does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RAJ-RERA does not publish a complaints register. This read cannot speak to them either way.