Complete project overview

RERA Telangana · Registration filing
Units
10 units
Unit mix
10 × 2BHK
Saleable area
117–147 sq mper unit, as filed
Floors
5
Land area
563 sq m
Built-up area
1,545 sq m
Road widening
59 sq mland set aside for road widening

Timeline

RERA approvedMar 2021
Proposed completionMar 2027
TodayJul 2026
Construction progress

100% overall, as filed

Excavation100%
Basement & plinth100%
Podiums100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

10 of 10 available
BuildingFloorTypeArea sq mAvailable
RADHA RESIDENCY12BHKmortgaged1471 of 1
RADHA RESIDENCY12BHKmortgaged1171 of 1
RADHA RESIDENCY22BHKmortgaged1471 of 1
RADHA RESIDENCY22BHKmortgaged1171 of 1
RADHA RESIDENCY32BHK1471 of 1
RADHA RESIDENCY32BHK1171 of 1
RADHA RESIDENCY42BHK1471 of 1
RADHA RESIDENCY42BHK1171 of 1
RADHA RESIDENCY52BHK1471 of 1
RADHA RESIDENCY52BHK1171 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

AADYA PROJECTS AND DEVELOPERS

PartnershipPromoter type
Warangal Urban, TelanganaBased in
1Projects
1City
2021–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
Vidyaranyapuri
Mandal
Hanamkonda
District
Warangal Urban
Pincode
506009
North boundary
2-1-630-1 of T Sudhakar
East boundary
15 Feet Wide Road
South boundary
40 Feet Wide Road
West boundary
Plot of Others
What’s nearby
SchoolsNearest school 1.8km away · 7 educational institutions within 1km · College or university 354m away
HealthcareHospital 184m away · 2 clinics within 1km · Pharmacy within 500m
LifestylePark 1.3km away · 7 restaurants and cafes within 1km
ShoppingSupermarket 320m away · Mall 394m away · Bank 368m away
Getting around
Expressway 282 mPrimary road 1.7 kmRailway line 3.5 kmRailway station 3.4km away (Komatipalli)Bus stop within 500m
Water & environment
Canal 483 mWater body 1.1 km · Pochamma Kunta
distances only — not a flood assessment
Declared external development
Roads100%
Water supply100%
Sewerage (Chamber,…100%
Rainwater100%
Green Strip/TOT LO…100%
Street lighting100%
Rainwater100%
Electricity100%
Aggregate area of …100%
Community Building…0%
Sewage0%
Solid waste0%
Renewable energy0%
Fire safety0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan

Directorate of Town & Country Planning (DTCP)

Town & Country Planning (DTCP)
Building Permit
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

DTCP

Town & Country Planning · towns & district HQs across Telangana

Has approved 3,737 RERA projectsabout 1 in 3 in Telangana, more than any other body in the state.

a plotted-layout market32% apartments · 68% plotted layouts. Apartments like yours are the smaller share here — this body mostly approves plotted layouts.

Builders
2,933
On record
41,686 flats · 4,33,404 plots
Reach
287 mandals
Since
2012

More layout-heavy than Telangana overall — 68% plots here vs 34% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.