Open Area of the project is 3414.82 sq. meters which includes Park [855.93 sq. meters], SWM+MT [60.00 sq. meters] and Road Area [2498.89 sq. meters]. The Saleable Area of the project is 5122.18 Sq. mtrs. which includes Residential [4695.35 Sq. Mtrs.], Retail Commercial [137.11 sq. meters] and Informal Commercial [289.72 Sq. Mtrs.]. The project has been applied for Phase area 8537 Sq. Mtrs. Since the project is situated outside the JDA limits i.e. in rural areas hence no units have been kept mortgaged with the local authority.
Timeline
Construction startMay 2025
RERA registeredAug 2025
Proposed completionOct 2026
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
21 plots across 14 batches
TypeArea sq mCount
Plot1392
Plot2041
Plot2051
Plot3371
Plot4654
Plot4601
Plot1391
Plot1351
Plot3621
Plot1341
Plot4481
Plot1341
Plot2901
Plot344
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Primary road 4.8 kmNo metro or railway within 5kmLimited bus connectivity nearby
Price analysisdeclared build cost — not a sale price
₹2.39 Cr declared to build 21 plots. What that works out to:
₹11.38 Lakhdeclared cost per plotall-in — land + construction
₹260/sq ftof plotted area₹2,800/sq m
25%of the cost is land₹64/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹962per sq yd
₹1,150per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “HARIRAMPURA”.
Highest rate
₹1,254 per sq yd — the top road-facing rate among the residential rates published for this village
By the road it faces
interior plot
₹1,150 / sq m
₹962 / sq yd
road-facing
₹1,250 / sq m
₹1,045 / sq yd
41–60 ft road
₹1,380 / sq m
₹1,154 / sq yd
61–99 ft road
₹1,440 / sq m
₹1,204 / sq yd
100 ft+ road
₹1,500 / sq m
₹1,254 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.
This filing declares ₹2,800 per sq m of plotted area — 2.43× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Senior Town Planner
Town & Country Planning
Layout Permitapproved 6 Aug 2025 · 1 yr ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Town Planning office
The state Senior Town Planner's office. It has approved 115 RERA projects across 18 districts — about 1 in 19 in Rajasthan.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.