As per Township Policy 2010, 01 Plot (Farm House No. 03) having Total area of 2594.85 Sq. mtr equal to 12.5% have been kept as mortgage under UIT PALI. These plots would be allotted after the internal development work of project is completed and development charges are deposited with UIT PALI.
Timeline
Construction startMar 2025
RERA registeredOct 2025
Proposed completionSep 2028
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
5 plots across 5 batches
TypeArea sq mCount
Plot3,2101
Plot3,0431
Plot2,5951
Plot3,5071
Plot3,6871
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Expressway 2.8 kmRailway line 1.4 kmRailway station 3.1km away (Kairla)Limited bus connectivity nearby
Water & environment
River 5.0 km · Bandi
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹4.94 Cr declared to build 5 plots. What that works out to:
₹98.88 Lakhdeclared cost per plotall-in — land + construction
₹213/sq ftof plotted area₹2,288/sq m
74%of the cost is land₹158/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan registration department
In Rajasthan it’s called the DLC rate.
No government guidance rate is shown for this project.
Rajasthan's schedule is in Horizon's record, but this project's filed location couldn't be matched to one place with certainty — so no figure is shown rather than a guess.
That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Urban Improvement Trust, Pali
Urban Development Authority
Layout Permitapproved 10 Mar 2025 · 1 yr ago
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Urban Improvement Trust, Pali
Development authority
Has approved 7 RERA projects — 0.3% of Rajasthan.
a plotted-layout market — 0% apartments · 100% plotted layouts. Your plotted layout is this body's core business.
Builders
7
On record
0 flats · 343 plots
Since
2025
More layout-heavy than Rajasthan overall — 100% plots here vs 66% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
18 plotted projects still under way within 25 km. Step out ring by ring:
Of the 8 projects the radar draws within 6 km — every kind, every stage — 6 are plotted projects still under way. This list keeps only those, and looks further out.
1 project between 1 and 3 km — showing the nearest 1.
No government guidance rate could be matched to this project from Rajasthan's published schedules.
05Planning authority
RAJ-RERA: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
06Complaints & litigation
RAJ-RERA's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/rajaram-farms-rohat-pali-n026luqu.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.