Revised completion
28 May 2021extended after an approved RERA extension
Extensions
1 approved · Covid19completion-date extension(s) granted by RERA
Quarterly reports
5 on file · latest Jul 2019 - Sep 2019quarterly progress certificates filed with RERA
Timeline
Project startedJul 2019
RERA registeredJun 2020
Proposed completionFeb 2021
TodaySep 2026
Find your plot
Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.
92 plots across 6 batches
TypeArea sq mCount
6.10 M X 9.14 M Plot—4
4.57 M X 12.19 M Plot—35
6.10 M X 12.19 M Plot—13
4.57 M X 9.14 M Plot—14
7.62m X 12.19 M Plot—1
Other Size As Per Auto Cad Plot—25
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).
The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Builder's track record — done
03
Location & price analysis
RERA Madhya Pradesh · Registration filing
District
Ratlam
Tehsil
Ratlam
Planning area
Ratlam
Address
SURVEY NO. 484/1/1, 484/1/2, 484/1/3, 484/1/4 LAND AT KASBA TAHSIL AND DISTT RATLAM (MP) - 457001
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 283m away · 2 clinics within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 1.5km away
Getting around
Expressway 1 mPrimary road 1.1 kmRailway line 439 m · Mumbai - Delhi RailwayRailway station 1.7km away (Ratlam New)Limited bus connectivity nearby
Water & environment
Water body 1.2 km · Jhali TalabRiver 1.9 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹1.93 Cr declared to build 92 plots. What that works out to:
₹2.10 Lakhdeclared cost per plotall-in — land + construction
63%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
MP Department of Registration & Stamps
In Madhya Pradesh it’s called the collector guideline rate.
₹7,943per sq yd
₹9,500per sq m
Which rate
open plot, residential
Matched to
The middle rate of the 591 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026
Colonies around this project
SAILAN BUS STAND (ROAD SE 20 M. TAK)
₹60,750 / sq m
₹50,795 / sq yd
30 m
MISSION HOSPITAL COMPOUND (ROAD SE 20 M. TAK)
₹60,000 / sq m
₹50,168 / sq yd
100 m
MISSION HOSPITAL COMPUND 20M. KE BAD
₹20,000 / sq m
₹16,723 / sq yd
130 m
PRADHAN DAK GHAR ROAD (ROAD SE 20 M. TAK)
₹1,12,200 / sq m
₹93,813 / sq yd
140 m
SAILANA ROAD BRIDGE-MAIN ROAD OVERBRIDGE KE BAGAL ME DONO TARAF (ROAD SE 20 M. TAK)
₹32,000 / sq m
₹26,756 / sq yd
140 m
The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.
What this number is — and isn’t
The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Madhya Pradesh · Approved building plan
Ratlam
Town & Country Planning (DTCP)
Layout Permit
The promised possession date (28 Feb 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Ratlam
Town & Country Planning area · Ratlam district
Has approved 110 RERA projects — 2.1% of Madhya Pradesh.
a plotted-layout market — 15% apartments · 85% plotted layouts. Your plotted layout is this body's core business.
Builders
73
On record
1,601 flats · 10,533 plots
Reach
4 tehsils
Since
2017
More layout-heavy than Madhya Pradesh overall — 85% plots here vs 72% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Madhya Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07