13 × Duplex No.- 20 To 32 · 11 × Duplex No.- 7 To17 · 11 × Duplex No.- 7 To 17 · 10 × Duplex No.- 33 To 42 · 8 × Duplex No.- 2 To 5 · 7 × Duplex No.- 51 To 57
Revised completion
31 May 2026extended after an approved RERA extension
Extensions
1 approved · Normalcompletion-date extension(s) granted by RERA
Quarterly reports
15 on file · latest Jul 2022 - Sep 2022quarterly progress certificates filed with RERA
Timeline
Project startedJun 2022
RERA registeredAug 2022
Proposed completionMay 2025
TodaySep 2026
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
85 units across 15 batches
TypeArea sq mCount
Duplex No.-1—1
Duplex No.- 2 To 5—8
Duplex No.- 6—2
Duplex No.- 7 To17—11
Duplex No.- 18—2
Duplex No.- 19—2
Duplex No.- 20 To 32—13
Duplex No.- 33 To 42—10
Duplex No.- 43 To 47—5
Duplex No.- 48 To 50—3
Duplex No.- 51 To 57—7
Duplex No.- E1 To E5—5
Duplex No.- L1 To L4—4
Duplex No.- 1—1
Duplex No.- 7 To 17—11
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
390 homes · 38 plotson the public record across 4 projects
₹44.24 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
SchoolsNo schools within 2km · College or university 1.4km away
HealthcareHospital 1.0km away
LifestylePark 612m away
ShoppingNo supermarket within 2km
Getting around
Expressway 573 m · Bhopal Bypass RoadPrimary road 1.6 km · Raisen RoadRailway line 4.3 kmNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Water body 1.8 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹2,000 declared to build 85 flats. What that works out to:
₹24declared cost per flatall-in — land + construction
50%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
MP Department of Registration & Stamps
In Madhya Pradesh it’s called the collector guideline rate.
₹23,412per sq yd
₹28,000per sq m
Which rate
multi-storey residential
Matched to
The middle rate of the 101 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026
Colonies around this project
SAI SPARSH-2/ SONPURA/ GURUDEEP NAGAR
₹30,000 / sq m
₹25,084 / sq yd
300 m
KHAJURI KHURD KI SABHI COLONY
₹28,000 / sq m
₹23,412 / sq yd
400 m
SHIV LOK GREEN / SHIV LOK KE SABHI SECTOR
₹42,000 / sq m
₹35,117 / sq yd
430 m
ANADI VILLA/ NANDI VILA PHASE-1,2
₹52,000 / sq m
₹43,479 / sq yd
440 m
SARLA HOMES
₹28,000 / sq m
₹23,412 / sq yd
570 m
The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.
What this number is — and isn’t
The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Madhya Pradesh · Approved building plan
Bhopal
Town & Country Planning (DTCP)
Building Permit
The promised possession date (31 May 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
The approving body, at scale
Bhopal
Town & Country Planning area · Bhopal district
Has approved 726 RERA projects — about 1 in 7 in Madhya Pradesh.
a mixed market — 63% apartments · 37% plotted layouts.
Builders
444
On record
45,421 flats · 32,913.65 plots
Reach
2 tehsils
Since
2017
More apartment-heavy than Madhya Pradesh overall — 63% apartments here vs 28% statewide.
Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Madhya Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
74 residential projects still under way within 25 km. Step out ring by ring: