Complete project overview

GujRERA · Registration filing
Units
49 units
Mix
49 × Residential Unit
Carpet area
72–122 sq mper-unit range, as filed
Parking
2 spaces
Land area
1,827 sq m

Timeline

Project startedJun 2022
RERA registeredAug 2023
Proposed completionDec 2029
TodayJul 2026
Construction progress

53% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your flat

Filed by type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

49 units across 1 batch
TypeArea sq mCount
Residential Unit8749

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Promoter registration

AAYAM INFRA

PARTNERSHIP FIRMPromoter type
Vadodara, GujaratBased in
1Projects
1City
2023–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Vadodara
District
Vadodara
Address
RISHIKESH REVIVENEAR ANNAT PARK SOCIETY VADIL VATSALAY LANE
What’s nearby
SchoolsNearest school 1.5km away
HealthcareHospital 350m away · 5 clinics within 1km
LifestyleNo parks within 2km · Gym or sports centre 1.5km away
ShoppingSupermarket 452m away · Bank 532m away
Getting around
Expressway 3.6 km · Kalaghoda CirclePrimary road 1.1 km · Atal FlyoverRailway line 2.7 km · Mumbai - Delhi RailwayRailway station 2.6km away (Atladara)Limited bus connectivity nearby
Land, title & encumbrance
MortgageLoan outstanding to AS PER LIST · ₹2.23 Cr outstanding
As declared by the promoter at registration — a RERA self-declaration, not an authority's independent finding. A flagged line is worth verifying against the title documents; it is not a verdict.
Price analysisdeclared build cost — not a sale price

₹11.14 Cr declared to build 49 flats. What that works out to:

₹22.73 Lakhdeclared cost per flatall-in — land + construction
₹2,431/sq ftof carpet area₹26,163/sq m
13%of the cost is land₹737/sq ft of land

This is what the promoter filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Planning authority

GujRERA · Approved building plan

Others

Building Permitapproved 31 Aug 2023 · 2 yrs ago
The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

The approving body, at scale

The approving authority

The body that sanctioned this project. It has approved 2,653 RERA projects across 26 talukas about 1 in 6 in Gujarat.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — GujRERA does not publish a complaints register. This read cannot speak to them either way.