HORIZON
Share

RIVIERA ELEGANCE 3

PR/GJ/KUTCH/GANDHIDHAM/Others/PAA10754/101022 · GujRERA · https://gethorizon.in/projects/riviera-elegance-3-gandhidham-rlti2yr5

01

Complete project overview

GujRERA · Registration filing
Plots
57 plots
Mix
57 × Residential Plots
Carpet area
250–2104 sq mper-unit range, as filed
Land area
45,828 sq m

Timeline

Project startedMay 2021
RERA registeredOct 2022
Proposed completionMar 2025
TodaySep 2026
Construction progress

0% overall, as filed

Overall % complete as filed with GujRERA, taken as the slowest of the project's blocks — a snapshot, not a live tracker. Where a BU permission is on record (section 04), that is the firmer completion signal.

Find your plot

Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.

57 plots across 1 batch
TypeArea sq mCount
Residential Plots54857

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

GujRERA · Builder registration

Bhavesh Fulchand Acharya

Individual/PropritorshipPromoter type
Kutch, GujaratBased in
1Projects
1City
2022–2025Active
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

GujRERA · Registration filing
Taluka
Gandhidham
District
Kutch
Address
SURVEY NO. 545/1, WELSPUN ROADNR. AIRPORT, VARSAMEDI
What’s nearby
SchoolsNo schools within 2km
HealthcareNearest hospital 2.8km away
LifestyleNo parks within 2km
ShoppingSupermarket 863m away
Getting around
Expressway 1.5 kmPrimary road 4.2 kmRailway line 2.5 kmRailway station 3.1km away (Gopalpura)Limited bus connectivity nearby
Water & environment
River 418 m
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹2.18 Cr declared to build 57 plots. What that works out to:

₹1.87 Lakh – ₹15.78 Lakhdeclared unit pricerange on the filing — not a live asking price
₹3.82 Lakhdeclared cost per plotall-in — land + construction
₹44/sq ftof plotted area₹476/sq m
22%of the cost is land₹10/sq ft of land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

Gujarat registration department

In Gujarat it’s called the jantri rate — the 2011 book, which is the one in Horizon's record.

No government guidance rate is shown for this project.

Gujarat's jantri is in Horizon's record, but this filing names no place the book prints — or names two — and a survey number repeats in every village of a district, so nothing can be tied to this project without guessing.

That is a statement about what Horizon can place — not a sign that no rate exists, and not a signal about the project.

05

Planning authority

GujRERA · Approved building plan

Others

Layout Permitapproved 10 Oct 2022 · 3 yrs ago

The promised possession date (31 Mar 2025) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

The approving authority

The body that approved this project. It has approved 2,653 RERA projects across 26 talukas about 1 in 6 in Gujarat.

Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

07

Other projects nearby

The register · within 25 km

11 plotted projects still under way within 25 km. Step out ring by ring:

Of the 39 projects the radar draws within 6 km — every kind, every stage — 4 are plotted projects still under way. This list keeps only those, and looks further out.

3 projects within 3 km — showing the nearest 3.

2.1 km awayPlotted Development

RAJVI BAAG

B F ACHARYA (HUF) · Gandhidham

Aug 2019registered
Jun 2026target completion
Declared cost₹93.61 LakhScale67 plotsAuthorityGujRERA
2.2 km awayPlotted Development

RAJVI AANGAN

MANISH CHAMPAKLAL MEHTA · Gandhidham

May 2025registered
Mar 2027target completion
Price band₹1.13 Lakh–₹3.40 LakhScale149 plotsAuthorityGujRERA
2.6 km awayPlotted Development

Green Orchid

SOMAIYA MANSUKH GOVIND · Gandhidham

Jan 2025registered
Jul 2027target completion
Price band₹4.10 Lakh–₹1.07 CrScale178 plotsAuthorityGujRERA

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. Distances from the filed coordinates.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.