2 extensions on record — latest to 15 Jan 2025declared reason: other than force majeure
Timeline
Construction startMay 2017
RERA registeredDec 2017
Proposed completionJan 2019
TodaySep 2026
Find your flat
Filed by type and size, in the batches the builder registered — not a per-flat listing. Look yours up.
94 units across 4 batches
BuildingTypeArea sq mCount
EWS/LIG2 BHK3610
EWS/LIG2 BHK3632
EWS/LIG1BHK2332
EWS/LIG1BHK2320
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Plot No.-20, Khsara No.- 2229 to 2247,2265 to 2286, BHUWANA, BHUWANA, Girwa, Udaipur, 313001
Village
BHUWANA
Taluka
Girwa
District
Udaipur
Pincode
313001
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 981m away · 3 clinics within 1km · Doctor's clinic within 1km
LifestyleNo parks within 2km
ShoppingSupermarket 1.9km away · Mall 1.9km away
Getting around
Expressway 1.2 km · Udaipur BypassPrimary road 126 mRailway line 4.3 kmRailway station 4.4km away (Ranapratap Nagar)Limited bus connectivity nearby
Water & environment
River 1.3 km · AharWater body 2.3 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹7.53 Cr declared to build 94 flats. What that works out to:
₹8.01 Lakhdeclared cost per flatall-in — land + construction
₹2,379/sq ftof built-up area₹25,604/sq m
34%of the cost is land₹1,168/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates
In Rajasthan it’s called the DLC rate.
₹19,281per sq yd
₹23,060per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “BHUWANA”.
Highest rate
₹42,291 per sq yd — the top road-facing rate among the 6 residential rates published for this village
By the road it faces
interior plot
₹23,060 / sq m
₹19,281 / sq yd
road-facing
₹25,510 / sq m
₹21,330 / sq yd
41–60 ft road
₹39,300 / sq m
₹32,860 / sq yd
61–99 ft road
₹42,820 / sq m
₹35,803 / sq yd
100 ft+ road
₹42,870 / sq m
₹35,845 / sq yd
The same land, priced by the width of the road it faces — each band the middle of the residential rates published for this village.
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 14 Dec 2017 · 8 yrs ago
The promised possession date (15 Jan 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
51 residential projects still under way within 25 km. Step out ring by ring: