HORIZON
Share

HORIZONSearch & explore India’s real estate — the whole picture. gethorizon.in1.2 lakh+ projects · 78k+ builders · 600+ micro-markets · across 22 states
Detailed Report

RUBY BHAGWAN ESTATE

P-BPL-17-236 · RERA Madhya Pradesh · https://gethorizon.in/projects/ruby-bhagwan-estate-bhopal-huzur-gw3b17gl

01

Complete project overview

RERA Madhya Pradesh · Registration filing
Project name
RUBY BHAGWAN ESTATE
Plots
38 plots
Unit mix
21 × Triplex Plot · 7 × 21x40 Plot · 5 × Lig Ews Plot · 3 × 40x60 Plot · 2 × Multi Stories Plot
Revised completion
30 Jun 2021extended after an approved RERA extension
Extensions
2 approvedcompletion-date extension(s) granted by RERA
Quarterly reports
21 on file · latest Oct 2017 - Dec 2017quarterly progress certificates filed with RERA

Timeline

Project startedApr 2014
Proposed completionDec 2019
RERA registeredFeb 2020
TodaySep 2026

Find your plot

Filed by type and size, in the batches the builder registered — not a per-plot listing. Look yours up.

38 plots across 5 batches
TypeArea sq mCount
40x60 Plot3
21x40 Plot7
Triplex Plot21
Multi Stories Plot2
Lig Ews Plot5

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each size exist, not how many are still unsold (this state's filing carries no booking count).

02

Builder’s track record

RERA Madhya Pradesh · Builder registration

RBS BUILDERS

Partnership Firm / LLPPromoter type
1Projects
1City
2020–presentActive
Timelineevery project, start → promised completion

The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location & price analysis

RERA Madhya Pradesh · Registration filing
≈ area only · geocoded, verified but not exact · 23.1493, 77.4365 · © OpenStreetMap contributors
District
Bhopal
Tehsil
Huzur
Planning area
Bhopal
Address
VILLAGE-HINOTIYA ALAM, KOLAR ROAD, BHOPAL
What’s nearby
SchoolsNo schools within 2km
HealthcareHospital 1.3km away
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 5.0 kmPrimary road 3.5 kmRailway line 3.0 kmRailway station 3.1km away (Misrod)Limited bus connectivity nearby
Water & environment
River 448 m · Ajmar
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price

₹1075634.85 Cr declared to build 38 plots. What that works out to:

₹28306.18 Crdeclared cost per plotall-in — land + construction
10%of the cost is land

This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.

04

Government Guidance Rate

MP Department of Registration & Stamps

In Madhya Pradesh it’s called the collector guideline rate.

₹25,084per sq yd
₹30,000per sq m
Which rate
open plot, residential
Matched to
The middle rate of the 84 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026

Colonies around this project

GRAM HINOTIYA ALAM EVAM ANYA COLONY₹17,000 / sq m₹14,214 / sq yd410 m
EARTH DYNESTY SUHAGPUR₹16,000 / sq m₹13,378 / sq yd660 m
GRAM SALAIYA EVAM ANAY COLONY₹25,000 / sq m₹20,903 / sq yd800 m
ABHYUDDAM JANKI RESIDENCY HINOTIYA ALAM₹20,000 / sq m₹16,723 / sq yd810 m
URBAN RIVER, SALAIYA₹30,000 / sq m₹25,084 / sq yd920 m

The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.

What this number is — and isn’t

  • The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
  • Not a market price. Sales normally register above it, and how far above varies by place and by project.
  • Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
05

Planning authority

RERA Madhya Pradesh · Approved building plan

Bhopal

Town & Country Planning (DTCP)
Layout Permit

The promised possession date (31 Dec 2019) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.

The approving body, at scale

Bhopal

Town & Country Planning area · Bhopal district

Has approved 726 RERA projectsabout 1 in 7 in Madhya Pradesh.

a mixed market63% apartments · 37% plotted layouts.

Builders
444
On record
45,421 flats · 32,913.65 plots
Reach
2 tehsils
Since
2017

More apartment-heavy than Madhya Pradesh overall — 63% apartments here vs 28% statewide.

Volume and mix are context, not a verdict — a busier body isn’t a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.

See every project approved by RERA Madhya Pradesh

07

Other projects nearby

The register · within 25 km

96 plotted projects still under way within 25 km. Step out ring by ring:

18 projects between 1 and 3 km — showing the nearest 6.

BhopalPlotted Development

SHRI GANPATI MANGALAM

GANPATI BUILDERS

Feb 2025registered
Sep 2029target completion
Declared cost₹2.83 CrScale31 plotsAuthorityRERA Madhya Pradesh
BhopalPlotted Development

SKYLINE VILLAS

SKYLINE INFRA

Jan 2024registered
Aug 2026target completion
Declared cost₹4.35 CrScale34 plotsAuthorityRERA Madhya Pradesh
BhopalPlotted Development

PALM SPRINGS

ASNANI LIFESPACES PRIVATE LIMITED

Aug 2022registered
Apr 2027target completion
Declared cost₹4.70 CrScale120 plotsAuthorityRERA Madhya Pradesh
BhopalPlotted Development

KASTURI ROYAL PARK 2

KASTURI REAL ESTATE

Jan 2023registered
Jul 2027target completion
Declared cost₹4.11 CrScale80 plotsAuthorityRERA Madhya Pradesh
BhopalPlotted Development

SAGE NIRVANA PHASE - I

S. K. ENTERPRISES

Jan 2023registered
Sep 2027target completion
Declared cost₹25.00 CrScale162 plotsAuthorityRERA Madhya Pradesh
BhopalPlotted Development

BUNDELKHAND GOLDEN CITY

BABLI RATHORE

Dec 2023registered
Jun 2026target completion
Declared cost₹1.67 CrScale20 plotsAuthorityRERA Madhya Pradesh

Projects within 25 km, nearest first — closed ones excluded, nothing ranked. This project’s coordinate is approximate, so distances are rough.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Complaints — RERA Madhya Pradesh does not publish a complaints register. This read cannot speak to them either way.

Sources

Where each section of this report comes from.

  1. 01Complete project overview
    • The project's registration filing with RERA Madhya Pradesh, as the builder submitted it.
  2. 02Builder's track record
    • RERA Madhya Pradesh: the builder's registration.
    • The track record: every project filed under this builder, counted by Horizon across the state RERA registers it holds.
  3. 03Location & price analysis
    • Address, pincode and declared cost: the RERA Madhya Pradesh filing.
    • Coordinates: geocoded by Horizon from the filed address with Google Geocoding, matched to the general area only, not the exact site.
    • What's nearby and getting around: distances measured by Horizon on OpenStreetMap data, © OpenStreetMap contributors (ODbL). Not from the RERA filing.
    • Map: © OpenStreetMap contributors (ODbL).
  4. 04Government Guidance Rate
    • MP Department of Registration & Stamps.
  5. 05Planning authority
    • RERA Madhya Pradesh: the approved building plan, as filed.
    • The approving body's other projects: counted by Horizon across the register.
  6. 06Complaints & litigation
    • RERA Madhya Pradesh's public record lists no complaints or litigation for this project.
  7. 07Other projects nearby
    • The RERA-registered projects Horizon holds within 25 km of these coordinates.

Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/ruby-bhagwan-estate-bhopal-huzur-gw3b17gl.

Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.