The only project Horizon has read from this builder so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Primary road 683 m · Nekarikallu - Gurazala RoadNo metro or railway within 5kmLimited bus connectivity nearby
Water & environment
Canal 562 m · Nagarjun Sagar Right CanalWater body 2.4 kmRiver 3.9 km
distances only — not a flood assessment
Government land classification
Land here includes House Sites (residential), plus Land abutting NH/SH/ZPP/MPP, Wet Land double crop, Dry land. The state classes land per survey— confirm your plot’s survey number is House Sites.
AP Registration & Stamps
Declared external development
Roads25%
Electricity25%
Water supply0%
Sewage0%
Solid waste0%
Fire safety0%
Water0%
Emergency exits0%
Renewable energy0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
Price analysisdeclared build cost — not a sale price
₹6.07 Cr declared to build 92 plots. What that works out to:
₹6.59 Lakhdeclared cost per plotall-in — land + construction
₹339/sq ftof plotted area₹3,646/sq m
70%of the cost is land₹137/sq ft of land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Satellite view of the site
Google Open Buildings, 2016–2023 · Sentinel-2 imagery
The yearly satellite view ends in 2023 and this project started in 2025, so it does not cover this project's construction: the site was still open ground within ~40 m of the recorded location when the series ends. The 2026 image shows the site more recently.
Satellite view, year by year
loading 2023…
Height estimated by a model from satellite imagery — not a survey, and the series ends in 2023. The dashed shape is within ~40 m of the filed location.
Satellite photographs of the same ground
Feb 2017Feb 2023Feb 2026
Sentinel-2, 10 m per pixel — about 400 m of ground across. Each frame is one dry-season day, so haze can dull a site.
How to read this
This series ends in 2023, before this project’s construction — so it shows what stood here before, and says nothing about whether building has since begun. The photograph does that.
This state publishes a point, not a plot outline, so the shape is a circle around it. A neighbour’s building can fall inside.
The location could only be checked loosely, so read this site view as indicative rather than as a statement about this project.
Site is a ~40 m circle around the RERA point, not a plot outline: buildings inside it may belong to neighbours.
Coordinate checked only against its district, not its pincode.
The yearly site view ends in 2023, before this project started in 2025.
Google Open Buildings 2.5D Temporal (CC BY 4.0) · Contains modified Copernicus Sentinel data 2017–2026
Satellite view of the site — done
05
Government Guidance Rate
AP Registration & Stamps
In Andhra Pradesh it’s called the market value — the registration department's figure, not a sale price.
₹1,200per sq yd
₹1,435per sq m
Which rate
House Sites
Matched to
The value published for this project's own survey number, in “survey 818, PETASANNIGANDLA”.
In force
effective Feb 2025
This filing declares ₹3,646 per sq m of plotted area — 2.54× the government figure. Declared cost is land and construction; the government guidance rate is what the state will not register a sale below. Neither is a sale price.
What this number is — and isn’t
The minimum value Andhra Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of parcel, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
06
Planning authority
RERA Andhra Pradesh · Approved building plan
Director, Town and Country Planning
Town & Country Planning (DTCP) · PALNADU URBAN DEVELOPMENT AUTHORITY
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Verify it yourself — look up plan 1195/0002/LP/KRMPD/2025 on the approving authority’s portal (dtcp.ap.gov.in) to confirm the approval.
The approving body, at scale
Director, Town & Country Planning (DTCP)
Andhra Pradesh's statewide town-planning directorate. It has approved 1,597 RERA projects across 13 mandals — about 1 in 4 in Andhra Pradesh.
This project sits in its PALNADU URBAN DEVELOPMENT AUTHORITY area — a smaller local market, with too few RERA projects on record to profile on its own.
Volume is context, not a verdict — a busier authority is not a safer project. And this counts RERA-registered projects on Horizon’s record, not all construction.
Not published. RERA Andhra Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Andhra Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Andhra Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Andhra Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
08
Other projects nearby
The register · within Guntur
116 plotted projects still under way within Guntur. Step out ring by ring:
Of the 1 projects the radar draws within 6 km — every kind, every stage — none is a plotted project still under way. This list keeps only those, and looks further out.
Building footprint and height by year: Google Open Buildings 2.5D Temporal (CC BY 4.0), a model estimate of building presence and height from satellite imagery.
Photographs: Copernicus Sentinel-2 imagery (contains modified Copernicus Sentinel data 2017–2026).
05Government Guidance Rate
AP Registration & Stamps.
06Planning authority
RERA Andhra Pradesh: the approved building plan, as filed.
The approving body's other projects: counted by Horizon across the register.
07Complaints & litigation
RERA Andhra Pradesh's public record lists no complaints or litigation for this project.
08Other projects nearby
The RERA-registered projects Horizon holds within Guntur of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/s-v-brundaavanam-petasannigandla-karempudi-8y1a7km4.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.