Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
994/1226, DEV NAGAR ROAD, BANSELI, PUSHKAR, Ajmer, 305022
Village
BANSELI
Taluka
PUSHKAR
District
Ajmer
Pincode
305022
What’s nearby
Schools1 school within 1km
HealthcareHospital 892m away
LifestyleNo parks within 2km · Gym or sports centre 896m away
ShoppingSupermarket 1.1km away · Mall 1.5km away
Getting around
Expressway 670 m · Pushkar Merta HighwayPrimary road 759 mRailway line 87 mRailway station 1.7km away (Pushkar)Bus stop within 1km
Water & environment
Water body 1.4 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹26.45 Cr declared. What that works out to:
5%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
Rajasthan IGRS — DLC rates (rural branch)
In Rajasthan it’s called the DLC rate.
₹1,054per sq yd
₹1,260per sq m
Which rate
residential, interior plot
Matched to
The rate published for the village of “Banseli”.
Spread
₹1,054 – ₹5,853 per sq yd across the places it was taken over
What this number is — and isn’t
The minimum value Rajasthan’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of village, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RAJ-RERA · Approved building plan
Building Permitapproved 14 Dec 2017 · 8 yrs ago
The promised possession date (31 Mar 2021) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RAJ-RERA · public record
Complaints register
Not published. RAJ-RERA doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RAJ-RERA
Litigation
None declared in this filing
Only what the builder declared, or what RAJ-RERA records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RAJ-RERA, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
7 residential projects still under way within 25 km. Step out ring by ring:
Of the 9 projects the radar draws within 6 km — every kind, every stage — 2 are residential projects still under way. This list keeps only those, and looks further out.
2 projects between 3 and 6 km — showing the nearest 2.