10 on file · latest Oct 2023 - Dec 2023quarterly progress certificates filed with RERA
Timeline
Project startedOct 2023
RERA registeredFeb 2024
Proposed completionJun 2026
TodaySep 2026
Find your unit
Filed by type and size, in the batches the builder registered — not a per-unit listing. Look yours up.
215 units across 1 batch
TypeArea sq mCount
Shops/Offices—215
Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. The declared inventory as registered — how many of each type exist, not how many are still unsold (this state's filing carries no booking count).
223 homes · 80 plotson the public record across 3 projects
₹62.69 Crdeclared build cost
Build cost is what the builder declared it costs to build — land plus construction, at registration. It gives a sense of how big a builder this is — not a price you pay, not build quality, and not whether they finish on time.
Every project Horizon has read from this builder, oldest first on the timeline. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.
Schools1 school within 500m · 5 educational institutions within 1km
HealthcareHospital 1.5km away · Clinic within 2km
LifestyleNo parks within 2km
ShoppingNo supermarket within 2km
Getting around
Expressway 4.0 km · Ahmedabad - Indore RoadPrimary road 1.5 km · Airport RoadRailway line 3.6 kmMetro station 1.5km away (Super Corridor 6)Limited bus connectivity nearby
Water & environment
Water body 1.5 km
distances only — not a flood assessment
Price analysisdeclared build cost — not a sale price
₹25.58 Cr declared to build 215 flats. What that works out to:
₹11.90 Lakhdeclared cost per flatall-in — land + construction
8%of the cost is land
This is what the builder filed it costs to build — land plus construction, at registration — not a sale price. The gap to an asking price is their margin, taxes and anything the filing doesn’t carry.
Location & price analysis — done
04
Government Guidance Rate
MP Department of Registration & Stamps
In Madhya Pradesh it’s called the collector guideline rate.
₹20,903per sq yd
₹25,000per sq m
Which rate
multi-storey residential
Matched to
The middle rate of the 123 colonies within 3 km of this project — its neighbourhood, not a single colony.
In force
2026-2027 schedule · effective Apr 2026
Colonies around this project
VIDHYA NIVAS/KRISHNA PARK/KRISHNA VIHAR
₹25,000 / sq m
₹20,903 / sq yd
220 m
HIGH LINK CITY EXTENSION
₹24,000 / sq m
₹20,067 / sq yd
280 m
SAMRIDDHI LOTUS
₹23,000 / sq m
₹19,231 / sq yd
350 m
SHRINATH SAPPHIRE
₹18,000 / sq m
₹15,050 / sq yd
360 m
RIDDHI SIDDHI CORRIDOR
₹23,000 / sq m
₹19,231 / sq yd
410 m
The same schedule, published for the places around this one — so the figure above reads in its neighbourhood, not alone.
What this number is — and isn’t
The minimum value Madhya Pradesh’s registration department will register a sale at. Stamp duty is usually charged on this or the price in the sale deed, whichever is higher.
Not a market price. Sales normally register above it, and how far above varies by place and by project.
Its fit depends on the grain the state publishes at. This one is matched at the level of locality, and says so above. How Horizon decides what to show.
Government Guidance Rate — done
05
Planning authority
RERA Madhya Pradesh · Approved building plan
Building Permit
The promised possession date (17 Jun 2026) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.
The occupancy certificate — the proof that isn’t here
An approved plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the approved plan carries penalty or demolition risk.
Planning authority — done
06
Complaints & litigation
RERA Madhya Pradesh · public record
Complaints register
Not published. RERA Madhya Pradesh doesn’t publish a complaints register in the record Horizon reads.
So there is nothing to count here — which is not the same as nothing having been filed.
What the builder declared
Declared to RERA Madhya Pradesh
Litigation
None declared in this filing
Only what the builder declared, or what RERA Madhya Pradesh records itself, can appear here — a case filed elsewhere and never declared would not.
Not a verdict. A complaint can be dismissed and a case can be won; an order can be appealed.
Not a clean bill. An empty record means nothing was filed with RERA Madhya Pradesh, or that this register doesn’t publish it — never that nothing happened.
Complaints & litigation — done
07
Other projects nearby
The register · within 25 km
15 commercial projects still under way within 25 km. Step out ring by ring:
RERA Madhya Pradesh: the approved building plan, as filed.
06Complaints & litigation
RERA Madhya Pradesh's public record lists no complaints or litigation for this project.
07Other projects nearby
The RERA-registered projects Horizon holds within 25 km of these coordinates.
Compiled by Horizon from public records. Each fact is reproduced as its source publishes it, and Horizon does not verify filings on the ground. The live record: gethorizon.in/projects/sarthak-square-juni-indore-xuxzvrsp.
Horizon does not rate, review, score or signal, and it gives no verdict, opinion or forecast. Its only aim is to seek the truth through data: what the public record says, where each fact comes from, and where the record is silent. Nothing in this document is legal, financial or investment advice; what to make of it is yours to decide.