Timeline

RERA approvedSep 2017
Proposed completionSep 2023
TodayJul 2026
Construction progress

100% overall, as filed

Excavation100%
Basement & plinth100%
Podiums100%
Stilt floor100%
Superstructure100%
Internal finishes100%
Flat fit-out100%
Stairs & lifts100%
External finishes100%
OC-readiness100%
Per-stage % as filed with the authority — a snapshot, not a live tracker. The lowest figure across every building/block, so no stage reads further along than the project’s slowest block.

Find your flat

Filed by floor and type and size, in the batches the promoter registered — not a per-flat listing. Look yours up.

27 of 35 available
BuildingFloorTypeArea sq mAvailable
SARVAGNA RESIDENCY12BHKmortgaged1054 of 4
SARVAGNA RESIDENCY13BHKmortgaged1391 of 1
SARVAGNA RESIDENCY12BHK1061 of 1
SARVAGNA RESIDENCY13BHK1391 of 1
SARVAGNA RESIDENCY22BHK1053 of 4
SARVAGNA RESIDENCY23BHK1392 of 2
SARVAGNA RESIDENCY22BHK1060 of 1
SARVAGNA RESIDENCY32BHK1052 of 4
SARVAGNA RESIDENCY33BHK1390 of 2
SARVAGNA RESIDENCY32BHK1061 of 1
SARVAGNA RESIDENCY42BHK1053 of 4
SARVAGNA RESIDENCY43BHK1392 of 2
SARVAGNA RESIDENCY42BHK1061 of 1
SARVAGNA RESIDENCY52BHK1054 of 4
SARVAGNA RESIDENCY53BHK1392 of 2
SARVAGNA RESIDENCY52BHK1060 of 1

Shown in sq m. The filing records square metres; the sq-ft view is a straight conversion. As filed at registration, in the batches the promoter declared — not a live booking system. "Mortgaged" batches were declared under mortgage to a bank/lender for project finance — check with the promoter that any specific flat is released before relying on clear title.

02

Builder’s track record

RERA Telangana · Promoter registration

HARI HARA INFRASTRUCTURES

PartnershipPromoter type
Warangal Urban, TelanganaBased in
1Projects
1City
2017–2023Active
Timelineevery project, start → promised completion

The only project Horizon has read from this promoter so far. Dates are the project’s start (where filed) and target-completion dates on the RERA filing; delivery isn’t reported here.

03

Location

RERA Telangana · Registration filing
Locality
HANAMKONDA
Village
GMH Hanmakonda
Mandal
Hanamkonda
District
Warangal Urban
Pincode
506001
North boundary
13M WIDE ROAD
East boundary
EXISTING BUILDING OF OTHERS
South boundary
EXISTING BUILDING OF OTHERS
West boundary
EXISTING BUILDING OF OTHERS
What’s nearby
Schools1 school within 1km · 3 educational institutions within 1km · College or university 409m away
HealthcareHospital 180m away · 4 clinics within 1km · Pharmacy within 1km
LifestylePark 1.5km away · Gym or sports centre 1.9km away · 5 restaurants and cafes within 1km
ShoppingSupermarket 964m away · Mall 531m away · Bank 507m away
Getting around
Expressway 214 m · naimnagar roadPrimary road 542 mRailway line 4.1 kmRailway station 4.3km away (Komatipalli)Limited bus connectivity nearby
Water & environment
Canal 236 mWater body 744 m · Pochamma Kunta
distances only — not a flood assessment
Declared external development
Roads100%
Water supply100%
Sewerage (Chamber,…100%
Rainwater100%
Green Strip/TOT LO…100%
Street lighting100%
Rainwater100%
Electricity100%
Aggregate area of …100%
Community Building…0%
Sewage0%
Solid waste0%
Renewable energy0%
Fire safety0%
% complete as filed at registration — no progress updates are published, so this is a starting-line snapshot.
04

Planning authority

RERA Telangana · Approved building plan
Building Permit
Survey no. 5

The promised possession date (19 Sep 2023) has passed. This record can’t confirm whether the project was completed — that sign-off is the occupancy certificate, below.

The occupancy certificate — the proof that isn’t here

A sanctioned plan is the government’s approval to build. It is not proof the project was built to that plan. That sign-off is the Occupancy Certificate (OC) — issued by the planning authority, the same body that approved the plan, not by RERA— and it isn’t in this record. Ask the builder for it, or check with the authority. Without an OC, banks may decline home loans, and any deviation from the sanctioned plan carries penalty or demolition risk.

What this record cannot tell you

  • Build quality — no filing records how well it was actually built.
  • Private disputes — only complaints escalated to the authority appear here.
  • What it will be worth — the record is the past; it does not price the future.
  • Construction progress — RERA Telangana does not publish quarterly progress reports. How far along it actually is cannot be read here.
  • Complaints — RERA Telangana does not publish a complaints register. This read cannot speak to them either way.